Laserfiche WebLink
s ELEVATED PIPE, <br />TOWER <br />PEDESTAL <br />I <br />NOTE: ALL EXCAVATION QUANTITIES <br />12 +/- YARDS <br />- - - - - - - <br />- - - <br />- - -- <br />- - - - - -- <br />- <br />- - - - <br />-- <br />- - - - - -- <br />- - <br />- - - - - <br />- - - -- <br />II <br />- - - - - -- - - - <br />- - - -- <br />- - -- <br />- - - - - -- <br />- <br />- - - - <br />-- <br />- - - - - -- <br />- - - - - - - <br />- - - -- <br />APP BY <br />VENTILATION <br />ENGR: <br />JLK <br />2 -28 -14 <br />HENDERSON OPERATIONS <br />- -- <br />- - - <br />-- <br />- <br />- - -- - -- - - - - - <br />2 -28 -14 <br />JLK <br />MECHANICAL <br />DRAWN BY. <br />JP <br />2 -2874 <br />A Climax Molybdenum <br />haves A Freeport- McMoRan Company <br />EMPIRE i PARSRALL. COLORADO <br />303 -569 -3221 <br />APPROXIMATE EXTENT OF <br />.- <br />CHECKED BY: <br />JCB <br />2 -28 -14 <br />SOIL TO <br />BE REMOVED <br />•. <br />' <br />TRENCH <br />AT NEW BEAM <br />- - -<<> <br />__ <br />16 +/- <br />YARDS <br />-------------------------- <br />SCALE: AS NOTED <br />OTHER APP BY: <br />PROJ. NO. 13024 SHT S2.3 REV. <br />i; <br />; =;. ; ; ; ; %; ; ;•' <br />NEW FDN <br />NEAR TOWER <br />APPROXIMATE <br />, , <br />; <br />85 +/- <br />YARDS <br />, <br />^. <br />EXISTING GRADE <br />)A�.k <br />.r6�- ,in.ii <br />�A L.�.�,`\I•y <br />G <br />� I <br />/ � l � <br />i. <br />�A f`r. <br />APPROXIMATE <br />AFTER CONSTRUCTIONL <br />PROFILE <br />rJ <br />ELEVATED <br />PIPE, <br />TOWER #5 <br />-SEE GENERAL NOTES <br />S2.3 <br />S2.3 <br />s ELEVATED PIPE, <br />TOWER <br />#6 <br />NOTE: ALL EXCAVATION QUANTITIES <br />S2.3 S2.3 <br />1 /g" = <br />1'_O" <br />LISTED ARE APPROXIMATE, BASED <br />ON INTERPRETATION OF EXISTING <br />GRADE IN PHOTOGRAPHS - NOT <br />SURVEYED TOPOGRAPHIC STUDIES. <br />DWG. NO. <br />REFERENCE DRAWINGS <br />DESCRIPTION OF REVISION <br />DATE <br />BY <br />APP BY <br />VENTILATION <br />ENGR: <br />JLK <br />2 -28 -14 <br />HENDERSON OPERATIONS <br />HENDERSON MILL <br />TAILINGS DROP LINE <br />EXCAVATION ELEVATIONS <br />ISSUED FOR BID WALK <br />2 -28 -14 <br />JLK <br />MECHANICAL <br />DRAWN BY. <br />JP <br />2 -2874 <br />A Climax Molybdenum <br />haves A Freeport- McMoRan Company <br />EMPIRE i PARSRALL. COLORADO <br />303 -569 -3221 <br />STRUCTURAL <br />CHECKED BY: <br />JCB <br />2 -28 -14 <br />ELECTRICAL <br />APPROVED BY: <br />PIPING <br />APPROVED BY: <br />SCALE: AS NOTED <br />OTHER APP BY: <br />PROJ. NO. 13024 SHT S2.3 REV. <br />