My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-03-27_INSPECTION - C1981028
DRMS
>
Day Forward
>
Inspection
>
Coal
>
C1981028
>
2014-03-27_INSPECTION - C1981028
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:41:26 PM
Creation date
3/27/2014 1:10:58 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981028
IBM Index Class Name
Inspection
Doc Date
3/27/2014
Doc Name
Inspection Report
From
DRMS
To
Coors Energy Company
Inspection Date
3/27/2014
Email Name
JLE
SB1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
March 27, 2014 C- 1981 - 028 /Keenesburg Strip Mine JLE <br />GENERAL MINE PLAN COMPLIANCE: <br />CEC is actively backfilling the north end of B -Pit was fly -ash. Two loads of ash had been delivered earlier in the <br />morning and Mr. Kipp indicated two additional loads would be delivered today. <br />The area of B -Pit where one lift of ash material has been backfilled was observed. This area is graded and stable. <br />a small layer of spoil is placed over the backfilled ash to reduce dust from the wind. <br />REVEGETATION — Rule 4.15; Vegetative Cover; Timing: <br />Area 25 was observed, some grass has begun to germinate this season. Some Cheatgrass was observed. Sand <br />Dropseed and Buffalo grass were also observed. <br />TOPSOIL — Rule 4.06; Removal 4.06.2; Substitute Materials 4.06.4(4); Storage and Protection 4.06.3; <br />Redistribution 4.06.4: <br />Topsoil stockpile A-3 was stable and vegetated. <br />Topsoil stockpiles A -1 and B -1 were vegetated and stable. CEC is currently placing topsoil in the B -Pit area north <br />of Parcel 32. A scraper was actively excavating topsoil from these stockpiles during this inspection and pacing it <br />on the reclaimed area. CEC has their depth markers in place to insure two feet of material is placed in this area. <br />DOCUMENTS RECEIVED <br />OTHER (SPECIFY) <br />Number of Partial Inspection this Fiscal Year: 7 <br />Number of Complete Inspections this Fiscal Year: 3 <br />Page 3 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.