RECEIVED
<br />r\ i\' MAR 2PAM40
<br />_110(2) Annual Report DIVISION OF RECLAMATION
<br />MINING AND SAFFTY
<br />According to C.R.S. 34- 32.5 -116 or 34 -32 -116, each year, on the anniversary date of the permit, an operator shall submit
<br />the Annual Fee, an Annual Report and Map showing the extent of current disturbances to affected land, required
<br />monitoring information, reclamation accomplished to date and during the preceding year, any new disturbance that is
<br />anticipated to occur during the upcoming year, any reclamation that will be performed during the upcoming year, the
<br />dates for the beginning of active operations, and the date active operations ceased for the year.
<br />Information contained in this report will be reviewed by the Division upon receipt and prior to the next compliance
<br />inspection of the site. If, while completing this report, you learn that your site is not in compliance with the rules and the
<br />act, it is advisable that the issues be rectified promptly to avoid possible enforcement action.
<br />1. Is the site identification sign posted in accordance with Rule 3.1.12(1). YES NO
<br />2. Is the affected area boundary clearly marked in accordance with Rule 3.1.12(2). CYN-
<br />D NO
<br />3. Is the mine site in final reclamation (all material extraction and stockpile removal is complete)? YES N(5�
<br />If "YES," please note time limits related to completion of reclamation, Rule 3.1.3.
<br />4. What was the date of last excavation, processing or hauling activity at the mine? 02?
<br />5. Does the mine operate more than 180 days per year
<br />If "NO ", please review Rule 1.13 to assure that your mine is in compliance.
<br />6. Has this mine been granted: a) approval of TEMPORARY CESSATION Status?
<br />b) approval for INTERMITTENT OPERATION?
<br />7. Number of acres currently affected (mining + incomplete and or unreleased reclamation).
<br />8. Number of acres that were newly affected during the current report year.
<br />9. Number of acres that were reclaimed during the current report year.
<br />10. Estimated new acreage to be affected in the next report year.
<br />11. Estimated acres to be reclaimed in the next report year.
<br />12. Total acres in various stages of reclamatinn cinrrp nPrm;t4nr1 ------
<br />Y>;'S NO
<br />YES
<br />NO
<br />R-d9 Q�
<br />d
<br />Total acres
<br />Permittee Name:
<br />Glacier Peak Art, Gems & Minerals
<br />Permit Number:
<br />M- 2002 -003
<br />Y1411,.7 U%,
<br />-Operation Name:
<br />Topaz Mt. Gem Mine
<br />County:
<br />Park
<br />seeded w/
<br />Annual Fee Due:
<br />$259.00
<br />Annivers Date:
<br />March 26, 2014
<br />111,¢
<br />Permit Acreage-
<br />4.50
<br />Current Bond Amt:
<br />$8,447.00
<br />According to C.R.S. 34- 32.5 -116 or 34 -32 -116, each year, on the anniversary date of the permit, an operator shall submit
<br />the Annual Fee, an Annual Report and Map showing the extent of current disturbances to affected land, required
<br />monitoring information, reclamation accomplished to date and during the preceding year, any new disturbance that is
<br />anticipated to occur during the upcoming year, any reclamation that will be performed during the upcoming year, the
<br />dates for the beginning of active operations, and the date active operations ceased for the year.
<br />Information contained in this report will be reviewed by the Division upon receipt and prior to the next compliance
<br />inspection of the site. If, while completing this report, you learn that your site is not in compliance with the rules and the
<br />act, it is advisable that the issues be rectified promptly to avoid possible enforcement action.
<br />1. Is the site identification sign posted in accordance with Rule 3.1.12(1). YES NO
<br />2. Is the affected area boundary clearly marked in accordance with Rule 3.1.12(2). CYN-
<br />D NO
<br />3. Is the mine site in final reclamation (all material extraction and stockpile removal is complete)? YES N(5�
<br />If "YES," please note time limits related to completion of reclamation, Rule 3.1.3.
<br />4. What was the date of last excavation, processing or hauling activity at the mine? 02?
<br />5. Does the mine operate more than 180 days per year
<br />If "NO ", please review Rule 1.13 to assure that your mine is in compliance.
<br />6. Has this mine been granted: a) approval of TEMPORARY CESSATION Status?
<br />b) approval for INTERMITTENT OPERATION?
<br />7. Number of acres currently affected (mining + incomplete and or unreleased reclamation).
<br />8. Number of acres that were newly affected during the current report year.
<br />9. Number of acres that were reclaimed during the current report year.
<br />10. Estimated new acreage to be affected in the next report year.
<br />11. Estimated acres to be reclaimed in the next report year.
<br />12. Total acres in various stages of reclamatinn cinrrp nPrm;t4nr1 ------
<br />Y>;'S NO
<br />YES
<br />NO
<br />R-d9 Q�
<br />d
<br />Total acres
<br />Total acres
<br />a uV4a
<br />Total acres
<br />Y1411,.7 U%,
<br />icui.
<br />Total acres
<br />backfilled:
<br />CZ_
<br />seeded w/
<br />2
<br />w /topsoil
<br />Z
<br />mulched w/
<br />111,¢
<br />approved mix:
<br />replaced:
<br />anDroved mulch:
<br />Total acres
<br />Total acres
<br />Topsoil
<br />Mulch application
<br />graded:
<br />G�, D 2.
<br />fertilized w/
<br />IV,4
<br />replacement
<br />�%
<br />rate (tons):
<br />/9
<br />a vd fertilizer:
<br />depth (in.):
<br />Seed
<br />Fertilizer
<br />Mulch
<br />application
<br />d C-f 5�
<br />application
<br />,, f
<br />application
<br />41,4
<br />method:
<br />method:
<br />method: