Laserfiche WebLink
//CC-MC->< <br />survey was conducted of the area where the comingled sediment and coal was placed. The total <br />estimated amount of material placed into C -Pit was 5,174 tons. <br />4. Increase height of Cement Kiln Dust (CKD) Stockpile <br />CEMEX would like to request the ability to increase the height of the CKD stockpile in C -Pit. <br />C -Pit capacity is currently limited by DBMS. However, it is possible that CEMEX will need <br />additional capacity to support continued operations in the future. At this time CEMEX is <br />placing the CKD to approximate existing grades but would like to increase the height of the <br />stockpile to 20 feet above the existing grade. Even though there is still adequate capacity in the <br />pit at this time, logistically it would be beneficial to stockpile and restore the area at a higher <br />height now, to efficiently manage the material and reduce the need to move CKD multiple <br />times. <br />If you have any questions regarding this submittal please contact Kimberly Dennis at <br />713 722 -1710. <br />Best regards, <br />Denise Arthur, Ph.D. <br />Environmental Manager <br />RECEIVED <br />MAR 1 1 2014 <br />Division of Reclamation, <br />Mining & Safety <br />United States Operations <br />P 0 Box 529, Lyons, CO 80540, USA, Phone (303) 823 -2100, Fax (303) 823 -2199 <br />