Laserfiche WebLink
6 (FORM 2 - Public filing) <br />8. Describe the estimated topsoil depth and how topsoil will be salvaged, stockpiled and redistributed for the re- establishment of <br />vegetation. Specify approximate topsoil redistribution depth: <br />No top soil will be disturbed. <br />9. Describe how drill holes will be plugged (refer to Rule 5.4 of the Rules for required abandonment procedures): <br />Not applicable. <br />10. Describe how portals, adits, shafts, ponds, excavations, or other disturbances will be reclaimed (refer to Rule 3 and Rule 5 for <br />specific reclamation performance standards). You may wish to contact the Division for closure specifications. <br />Capital Prize Mine is an existing mine. The portal for the main tunnel was constructed in <br />1905. The portal will not be disturbed. There will be no surface disturbances such as <br />excavations or ponds. Activity in the mine will consist of clearing blockages and spreading <br />is not nnticipated_ <br />11. Describe how roads will be reclaimed or returned to their pre - prospecting (or better) condition: <br />A9611 nnt 98911 <br />The mine- us accessed vi -a ro ad &_ in GeorgQtOl - Agn ' in a significant increase in road use or deterioration. The mine has been used for tours <br />intermittently since 2009 and is easily reached by passenger automobile. <br />