Laserfiche WebLink
Y C6 <br />MINE ENGINEERING <br />MINE RECLAMATION <br />March 18, 2014 <br />J. E. STOVER & ASSOCIATES, INC. <br />2352 NORTH 7T" STREEET, UNIT B <br />GRAND )UNCTION, COLORADO 81501 <br />PHONE: (970) 245 -4101, FAX: (970) 242 -7908 <br />CIVIL ENGINEERING <br />CONST. MANAGEMENT <br />DECEIVED <br />Susan Burgmaier <br />MAR 2 4 2014 <br />Division of Reclamation, Mining & Safety DNISION OF RECLAMATION <br />1313 Sherman St., Room 215 MINING AND SAFETY <br />Denver, CO 80203 <br />Re: Bowie Resources, LLC, Bowie No. 2 Mine <br />Technical Revision #87, Expand Pond D, Relocate E. & W. Diversion Ditches <br />Permit C -1996 -083 <br />Dear Ms. Burgmaier: <br />On behalf of Bowie Resources, LLC, (BRL), enclosed is an application for a technical revision to <br />expand Pond D and to relocate the East and West Diversion ditches higher on the slope above <br />gob pile #2. <br />The expansion of Pond D will allow the runoff from Gob Piles 2/4 to be divided between Ponds D <br />and F. Pond D will increase in available storage from 0.89 acre -feet to 1.85 acre -feet. The <br />storage volume required for Pond D is 1.07 acre -feet. The expansion of Pond D will involve <br />relocating or removing culverts and other hydrology structures, installing new culverts, and <br />demolishing the old Coal Sales houses currently located in the material storage area. <br />Documentation of the Coal Sales house is provided in Volume VI by report dated September 15, <br />1996. <br />No new disturbance will be created with the Pond D expansion, however, the disturbed area <br />boundary shown on Map -18 does not reflect what is currently disturbed in the material storage <br />area. In the future revision, the disturbed area boundary will be revised on Map -18 to accurately <br />reflect what is disturbed on the ground. <br />The work at Pond D will involve relocating the Pond C discharge valve structure (no change in <br />bond), removal of three culverts (C -G2, C-F4 & one un- named, bond credit), re- installing and re- <br />setting the elevation of one culvert (C -D1, no change in bond), installing two new culverts (C -G5 <br />& C -G6 increase in bond), and installing a concrete box outlet structure (increase in bond). <br />Please see the attached reclamation estimate. <br />The East and West Diversion ditches will be relocated higher up on the hillside which will allow <br />for more gob storage. An application for an increase in the height of gob pile #2 will be <br />submitted under a separate technical revision application, along with a SedCad analysis, and <br />applicable maps. It is anticipated that the future technical revision application will include text <br />updates in Volume IX, Appendix B, and Figures 1-3. Also included will be Volume II, Maps 15 -1 <br />& 3, 18, 20, 21 -1 & 3 and 32. <br />