My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-03-21_REPORT - C1980005
>
Day Forward
>
Report
>
Coal
>
C1980005
>
2014-03-21_REPORT - C1980005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/29/2017 12:53:07 PM
Creation date
3/24/2014 9:30:58 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980005
IBM Index Class Name
Report
Doc Date
3/21/2014
From
Seneca Coal Company
To
DRMS
Annual Report Year
2013
Permit Index Doc Type
Annual Reclamation Report
Email Name
JHB
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SENECA II MINE <br />2013 ANNUAL RECLAMATION REPORT <br />2012 DISTURBANCE AREA <br />No additional acres were disturbed during 2013. The total disturbed area remains at 271.2 acres. <br />This acreage is reflected on the CDRMS Annual Report Form and is included in the text of the <br />following report. The 2013 Reclamation Map portrays the extent of the disturbance boundaries. <br />BACKFILLING AND GRADING <br />No backfilling occurred in 2013 at Seneca II mine. <br />SOIL AND SPOIL MONITORING <br />SCC is required by Permit C -80 -005 to monitor the salvage, storage, and redistribution of soil <br />and spoil handling operations at Seneca 11 Mine. <br />• Soil Recovery Documentation <br />No additional topsoil was salvaged since no new disturbance occurred. <br />Soil Pit - Topsoil Fertility /Spoil Quality <br />No additional soil pit or spoil samples were collected within the Permanent Program permit area <br />in 2013. <br />• Soil Balance <br />Seneca submitted the final soil balance as Technical Revision No. 31 on June 26, 1997 as the <br />final reclamation — topsoil management plan for Seneca 11. Subsequently, the CDMG approved <br />this final topsoil management plan on December 9, 1997. Hence, no soil balance will be <br />submitted with any further Annual Reclamation Report. <br />• Soil Salvage, Storage and Replacement <br />No additional topsoil was placed in 2013. <br />
The URL can be used to link to this page
Your browser does not support the video tag.