Laserfiche WebLink
Trapper Mine; C- 1981 -010; PR07 Cost Estimate <br />Operator Skill: <br />Material consistency: <br />Dozing method: <br />Visibility: <br />Job efficiency: <br />Spoil pile: <br />Push gradient: <br />Altitude: <br />Material Weight: <br />Blade type: <br />0.750 <br />(AVG.) <br />1.000 <br />(CAT HB) <br />1.200 <br />(S -BY -S) <br />0.800 <br />(POOR) <br />0.790 <br />(3 SHIFTS/DAY) <br />1.000 <br />(DOZ -OC) <br />1.426 <br />(CAT HB) <br />1.000 <br />(CAT HB) <br />0.929 <br />(CAT HB) <br />1.000 <br />(PAT) <br />Net correction: 0.7535 <br />Adjusted unit production: <br />Adjusted fleet production: <br />JOB TIME AND COST <br />680.56 LCY/hr <br />2722.24 LCY/hr <br />Fleet size: 4 Dozer(s) <br />Unit cost: $0.565/LCY <br />Total job time: <br />Total job cost: <br />36.25 Hours <br />$55,790.33 <br />Page 18 of 270 <br />