Laserfiche WebLink
Entrance <br />U � Quincy Avenue - - - <br />Current Affected Upland Areas <br />■ 1 _ Coal Creek Resources <br />Schmidt Construction Company <br />2014 Annual Report Map <br />>J Drawn by: MAH Date: Man:h 2074 <br />.'0 <br />e (. <br />■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ NEW PERMIT BOUNDARY (established in 2012) <br />Released = 165.1 acres <br />Being Revegetated = 0 acres <br />JJ <br />■ o °� (up to about 32 acres to be seeded in 2014) <br />■ o - <br />■ o <br />■ 00 °' ■ ■ More finished = 32 acres (fine grading + possible seeding needed) <br />S Grading /Topsoiling = 33.4 acres <br />a Less finished = 1.2 acres (within pit area) <br />■ <br />■ Mining Processes Occurring = 60.9 acres <br />° (includes about 40 acres in the processing <br />■ o Y o° plant facilities and connecting roads.) <br />A. New Mining in Next Year = 4.1 acres (for perhaps 12 to 18 mo.) <br />■ <br />o ° (market dependent) <br />■ <br />■ O �. 0 O� N '•. <br />g <br />South Lowland Acreages: w es: (not included above) <br />■ ■ ,;.. 1. No mining occurring; no changes have occurred so no map provided. <br />2. 25.8 acres of ongoing reclamation (flood damage recovery) <br />■ = 3. 17.2 acres released <br />■ I � n <br />■ O <br />1" = approx 950' <br />0 0 500 1000 1500 2000 <br />■� O <br />New Category taaaea 2012t - <br />■ Land Released from Reclamation Permit <br />0 due to Oil and Gas Activities. <br />_e <br />gm <br />� U <br />■ <br />■ / iNm <br />i � <br />200 - <br />RE 2U <br />■ L 1 AR U •♦ <br />(j .0 2.7 acres) \ <br />1 � <br />I <br />ARE 1 �� <br />ge� � I r ♦ i <br />14 <br />L& IQV c <br />23 4 <br />�� •� �.• 41 ■ ackfill and <br />i opsoil <br />1 a tockpile <br />0 1A <br />40 mom <br />V i ". r N <br />tit C <br />