My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-03-21_REPORT - M1980244
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2014-03-21_REPORT - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:41:16 PM
Creation date
3/21/2014 3:15:34 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REPORT
Doc Date
3/21/2014
Doc Name
Weekly construction quality assurance report week ending 3/15/14
From
CC&V
To
DRMS
Email Name
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
rx <br />CQA ACTIVITIES: <br />I) Field Activities: Observation of construction activities during this reporting period included: Slope grading and fill <br />placement; Ambient and fill temperature monitoring and recording; Underground working remediation, confirmatory <br />drilling and blasting; Production drilling and blasting; Closure drain installation; 112:1 grout placement and testing, SF, <br />SLF and DCF processing; 100 -mil LLDPE SSMS geomembrane and LDPE 5mm weld rod delivery and inventory. <br />II) Laboratory Activities: Laboratory testing continued with Permeability, Particle Size Distribution, Atterberg Limits, <br />Moisture- Density relationships, gradations, material classification, identifications, and field material sampling were <br />performed during this reporting period. <br />The following samples were collected and returned to AMEC's laboratory for analysis: <br />Drain Cover Fill sample numbers DCF 62 <br />Soil Liner Fill sample numbers SLF 117 -S through SLF 120 -S <br />Structural Fill sample numbers SF 34 -R through SF 45 -R <br />Test pit samples for Soil Liner Fill resource above the rip rap processing area <br />Note: Samples labeled with the suffix "R" are samples of Record 1 QA samples; those without are QC samples. <br />General Project Items <br />Meetings and Discussions: The Contractor Meeting occurred on March 12, 2014 with CC &V Projects, AMEC, and Ames. <br />Summary of Concerns: None. <br />CC &V: Daily updates, reporting and scheduling are some of the tasks occurring between CC &V Projects, AMEC, and Ames. <br />Miscellaneous: <br />AK Drilling began drilling Closure Drain CD -7 at the bottom of the PSSA. <br />Drain cover fill processing continued. <br />Rip rap processing continued. <br />Deliveries: Eight (8) truckloads consisting of 96 total rolls of 100 mil LLDPE SSMS geomembrane and 150 spools of LDPE <br />5mm weld rod were delivered to the site, recorded, and inventoried. <br />Submitted by: <br />Bobby Redd, El <br />Reviewed By: . <br />Tim Burkhard <br />Project Resident Manager <br />Phone: 719.689.2986 <br />Approved By: <br />CC &`' Projects <br />Date: 03 -17 -2014 <br />Date: 03 -18 -2014 <br />Date: '64 `; - r <br />Page 3 of 6 MLE2 NN'E 15 March 2014.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.