" qp <br />CRIPPLE CREEK & VICTOR GOLD MINING Co. <br />Squaw Gulch (VLF), HWY 67 Realignment Field Monitoring Summary Weekly Report <br />Owner: Cripple Creek & Victor Gold Mining Co. Project Number: Date <br />Project: Squaw Gulch (VLF), Hwy 67 Realignment 74201125N0. 15 March 2014 <br />Location: Cripple Creek & Victor Gold Mine, Colorado <br />Contractor: Ames Construction Co. Tnc. <br />Reporting Period: 3.9.14 through 3.15.14 <br />Days <br />S <br />M <br />T <br />W <br />T <br />F <br />S <br />Work Shifts <br />D <br />D <br />D <br />D <br />D <br />DID <br />N�N <br />N�N <br />N <br />N <br />- <br />D = Dar Shift N = Night Shift <br />W = Weather <br />Day <br />Ambient Temperature Ranges for reporting period: <br />Low: 7 °F to 35 °F <br />High: 33°F to 53 °F <br />Ames: Continuing construction tasks for the VLF. <br />Weather conditions for reporting period: <br />Cloud Cover: Partly cloudy to overcast. <br />Precipitation: Snow Tuesday, March 11, 2014 <br />Wind: Variable <br />Planning: Continuing construction activities and scheduling for the VLF. <br />CONSTRUCTION ACTIVITIES and PROGRESS: <br />I) Earthworks <br />A) VLF (PSSA, Phase I, Phase II) <br />Topsoil I Overburden Stripping: No topsoil stripping occurred; however, Cat dozers shaped and packed the <br />slopes of the Area 34 Topsoil Stockpile. <br />Production drilling: Production drilling occurred within the VLF limits. <br />Production blasting: Four (4) production blasts occurred within the VLF. <br />Structural Fill: <br />A Cat 992 loader removed material from near stations B12 +00 to B17 +00. The material was hauled to the ADR <br />haul road fill; between STA H18 +00 and H30 +00 and in the buttress fill area adjacent to Dump 4, in 777 haul trucks <br />and was placed as structural fill by a Cat D10R dozer. Cat dozers also cut material from the slopes above the ADR <br />Haul Road fill areas. The material was pushed down to the fill area, placed as structural fill and compacted per the <br />project specification. <br />A John Deere 850 excavator removed material from the top of Dump 4 and near the Phase 2 diversion channel, <br />STA 32 +00 and 35 +00. This material was transported using Cat 740 haul trucks for placement as structural fill near <br />stations K26 +00 to K30 +00 in the Phase 2 diversion channel area. The structural fill was placed and compacted per <br />method specification. <br />Cat dozers cut the slope to rough grade near between stations G2 +00 to G3 +00, H8 +00 to H12 +00, K31 +00 to <br />K33 +00, P4 +00 to P6 +00 and DD6 +00 to B14 +00. <br />Page I of 6 MI-E2 WF, 15 March 2014.doe <br />