Laserfiche WebLink
Bowie No. 2 Mine Reclamation Cost Estimate RN -3 Page 58 of 312 <br />TRUCK/LOADER TEAM WORK <br />Task description: Haul Mat'l from Bowie No. 1 Stkpl to Hubbard Crk Vent Shaft <br />Site: Bowie No. 2 Mine Permit Action: Permit Renewal 3 Permit/Job #: C1996083 <br />PROJECT IDENTIFICATION <br />Task #: 026 State: Colorado Abbreviation: None <br />Date: 1/16/2013 County: Delta Filename: C083 -026 <br />User: SLB <br />Agency or organization name <br />HOURLY EQUIPMENT COST <br />DRMS <br />Truck Loader Team - Truck: Generic 10 -12 cy, 6x4 <br />- Loader: CAT 950H <br />Support Equipment -Load Area: Cat D9T - 9SU <br />-Dump Area: NA <br />Road Maintenance —Motor Grader: NA <br />-Water Truck: NA <br />Shift basis: 1 per day <br />Cnct Rreakdnwn! Tnick/l .Hader Team Snnnnrt Fnninment Maintenance Fnninment <br />Total work team cost/hour: $955.09 <br />MATERIAL QUANTITIES <br />Initial volume: 3,000 CCY Swell factor: 1.125 <br />Loose volume: 3,375 LCY <br />Source of estimated volume: Operator Estimate <br />Source of estimated swell factor: Cat Handbook <br />Material Purchase Cost: $0.00 <br />Total Cost: $0.00 <br />HOURLY PRODUCTION <br />Truck Capacity: <br />Truck Payload (weight) Basis: <br />Material weight: 2,900 <br />Description: User Provided <br />Rated Payload: 35,400 <br />Payload Capacity: 12.21 <br />Pounds /LCY <br />Pounds <br />LCY <br />Truck <br />Loader <br />Load Area <br />Dump Area <br />Motor Grader <br />Water Truck <br />%Utilization- machine: <br />100 <br />100 <br />100 <br />NA <br />NA <br />NA <br />Ownership cost /hour: <br />$12.02 <br />$24.98 <br />$69.88 <br />NA <br />NA <br />NA <br />Operating cost /hour: <br />$63.21 <br />$43.03 <br />$142.13 <br />NA <br />NA <br />NA <br />Ripper op. cost/hour: <br />NA <br />$0.00 <br />$0.00 <br />NA <br />NA <br />NA <br />Operator cost /hour: <br />$0.00 <br />$35.82 <br />$37.41 <br />NA <br />NA <br />NA <br />Unit Subtotals: <br />$75.23 <br />$103.83 <br />$249.42 <br />NA <br />NA <br />NA <br />Number of Units: <br />8 <br />1 <br />1 <br />0 <br />0 <br />0 <br />Group Subtotals: <br />Work: $705.67 <br />Support: $249.42 <br />Maint: $0.00 <br />Total work team cost/hour: $955.09 <br />MATERIAL QUANTITIES <br />Initial volume: 3,000 CCY Swell factor: 1.125 <br />Loose volume: 3,375 LCY <br />Source of estimated volume: Operator Estimate <br />Source of estimated swell factor: Cat Handbook <br />Material Purchase Cost: $0.00 <br />Total Cost: $0.00 <br />HOURLY PRODUCTION <br />Truck Capacity: <br />Truck Payload (weight) Basis: <br />Material weight: 2,900 <br />Description: User Provided <br />Rated Payload: 35,400 <br />Payload Capacity: 12.21 <br />Pounds /LCY <br />Pounds <br />LCY <br />