Laserfiche WebLink
Bowie No. 2 Mine Reclamation Cost Estimate RN -3 Page 54 of 312 <br />BULLDOZER WORK <br />Task description: Regrade Hubbard Creek Vent Shaft Pad <br />Site: Bowie No. 2 Mine Permit Action: Permit Renewal 3 Permit/Job #: C1996083 <br />PROJECT IDENTIFICATION <br />Task #: 024 State <br />Date: 1/16/2013 County <br />User: SLB <br />Colorado <br />Delta <br />Agency or organization name: DBMS <br />HOURLY EOUIPMENT COST <br />Basic Machine: <br />Cat D l OT - l OSU <br />Horsepower: <br />574 <br />Blade Type: <br />Semi - Universal <br />Attachment: <br />NA <br />Shift Basis: <br />1 per day <br />Data Source: <br />(CRG) <br />Cost Breakdown: <br />Abbreviation <br />Filename <br />Total unit Cost/Hour: $319.93 <br />Total Fleet Cost/Hour: $1,279.71 <br />MATERIAL QUANTITIES <br />Initial Volume: 2,900 <br />Swell factor: 1.250 <br />Loose volume: 3,625 LCY <br />Source of estimated volume: Operator Estimate <br />Source of estimated swell Cat Handbook <br />factor: <br />HOURLY PRODUCTION <br />Average push distance <br />Unadjusted hourly <br />production: <br />100 feet <br />1,718.9 LCY /hr <br />Materials consistency description: Compacted fill or embankment 0.9 <br />Average push gradient: <br />Average site altitude: <br />Material weight: <br />10% <br />6,900 feet <br />900 lbs /LCY <br />Weight description: User Provided <br />Job Condition Correction Factor Source <br />Operator Skill: 0.750 (AVG.) <br />None <br />C083 -024 <br />Utilization % <br />Ownership Cost /Hour: <br />$99.15 <br />NA <br />Operating Cost/Hour: <br />$183.36 <br />100 <br />Ripper op. Cost /Hour: <br />$0.00 <br />0 <br />Operator Cost /Hour: <br />$37.41 <br />NA <br />Total unit Cost/Hour: $319.93 <br />Total Fleet Cost/Hour: $1,279.71 <br />MATERIAL QUANTITIES <br />Initial Volume: 2,900 <br />Swell factor: 1.250 <br />Loose volume: 3,625 LCY <br />Source of estimated volume: Operator Estimate <br />Source of estimated swell Cat Handbook <br />factor: <br />HOURLY PRODUCTION <br />Average push distance <br />Unadjusted hourly <br />production: <br />100 feet <br />1,718.9 LCY /hr <br />Materials consistency description: Compacted fill or embankment 0.9 <br />Average push gradient: <br />Average site altitude: <br />Material weight: <br />10% <br />6,900 feet <br />900 lbs /LCY <br />Weight description: User Provided <br />Job Condition Correction Factor Source <br />Operator Skill: 0.750 (AVG.) <br />None <br />C083 -024 <br />