Laserfiche WebLink
Bowie No. 2 Mine Reclamation Cost Estimate RN -3 Page 33 of 312 <br />TRUCK/LOADER TEAM WORK <br />Task description: Haul Fill fr Adj. Mat'l Storage Area to B -Seam Portal Bench <br />Site: Bowie No. 2 Mine Permit Action: Permit Renewal 3 Permit/Job #: C1996083 <br />PROJECT IDENTIFICATION <br />Task #: 014 State: Colorado <br />Date: 1/16/2013 County: Delta <br />User: SLB <br />Agency or organization name <br />HOURLY EQUIPMENT COST <br />DRMS <br />Truck Loader Team - Truck: Cat 773F <br />- Loader: CAT 988H <br />Support Equipment -Load Area: <br />-Dump Area: <br />Road Maintenance —Motor Grader: <br />-Water Truck: <br />NA <br />NA <br />NA <br />NA <br />Abbreviation: None <br />Filename: C083 -014 <br />Shift basis: I per day <br />Cost Rreakdown: Truck /Loader Team Sunnort Eauipment Maintenance Eauipment <br />Total work team cost/hour: $646.61 <br />MATERIAL QUANTITIES <br />Initial volume: 53,000 CCY <br />Loose volume: 61,745 LCY <br />Swell factor: 1.165 <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Cat Handbook <br />Material Purchase Cost: $0.00 <br />Total Cost: $0.00 <br />HOURLY PRODUCTION <br />Truck <br />Loader <br />Load Area <br />Dump Area <br />Motor Grader <br />Water Truck <br />%Utilization- machine: <br />100 <br />100 <br />NA <br />NA <br />NA <br />NA <br />Ownership cost/hour: <br />$60.64 <br />$82.23 <br />NA <br />NA <br />NA <br />NA <br />Operating cost/hour: <br />$119.47 <br />$117.03 <br />NA <br />NA <br />NA <br />NA <br />Ripper op. cost/hour: <br />NA <br />$0.00 <br />NA <br />NA <br />NA <br />NA <br />Operator cost/hour: <br />$25.66 <br />$35.82 <br />NA <br />NA <br />NA <br />NA <br />Unit Subtotals: <br />$205.77 <br />$235.07 <br />NA <br />NA <br />NA <br />NA <br />Number of Units: <br />2 <br />1 <br />0 <br />0 <br />0 <br />0 <br />Group Subtotals: <br />Work: $646.61 <br />Support: $0.00 <br />Maint: $0.00 <br />Total work team cost/hour: $646.61 <br />MATERIAL QUANTITIES <br />Initial volume: 53,000 CCY <br />Loose volume: 61,745 LCY <br />Swell factor: 1.165 <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Cat Handbook <br />Material Purchase Cost: $0.00 <br />Total Cost: $0.00 <br />HOURLY PRODUCTION <br />Truck Capacity: <br />Truck Payload (weight) Basis: <br />Material weight: 2,900 <br />Pounds /LCY <br />Description: Decomposed rock - <br />50% Rock, 50% Earth <br />Rated Payload: 122,520 <br />Pounds <br />Payload Capacity: 42.25 <br />LCY <br />