Laserfiche WebLink
Bowie No. 2 Mine Reclamation Cost Estimate RN -3 Page 15 of 312 <br />BULLDOZER WORK <br />Task description: Rip and Regrade Material Storage Area at Gob Pile <br />Site: Bowie No. 2 Mine Permit Action: Permit Renewal 3 Permit /Job #: C1996083 <br />PROJECT IDENTIFICATION <br />Task #: 005 <br />Date: 1/16/2013 <br />User: SLB <br />State: Colorado <br />County: Delta <br />Agency or organization name: DRMS <br />HOURLY EOUIPMENT COST <br />Basic Machine: <br />Cat D10T - IOSU <br />Horsepower: <br />574 <br />Blade Type: <br />Semi - Universal <br />Attachment: <br />NA <br />Shift Basis: 1 per day <br />Data Source: (CRG) <br />Cost Breakdown: <br />Abbreviation: None <br />Filename: C083 -005 <br />Total unit Cost /Hour: $319.93 <br />Total Fleet Cost/Hour: $1,279.71 <br />MATERIAL QUANTITIES <br />Initial Volume: 3,630 <br />Swell factor: 1.165 <br />Loose volume: 4,229 LCY <br />Source of estimated volume: Map 15 -1 <br />Source of estimated swell Cat Handbook <br />factor: <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly <br />production: <br />100 feet <br />1 ,718.9 LCY/hr <br />Materials consistency description: Compacted fill or embankment 0.9 <br />Average push gradient: <br />Average site altitude: <br />Material weight: <br />0% <br />6.000 feet <br />900 lbs /LCY <br />Weight description: Decomposed rock - 50% Rock, 50% Earth <br />Job Condition Correction Factor Source <br />Operator Skill: 0.750 (AVG.) <br />Utilization % <br />Ownership Cost /Hour: <br />$99.15 <br />NA <br />Operating Cost/Hour: <br />$183.36 <br />100 <br />Ripper op. Cost /Hour: <br />$0.00 <br />0 <br />Operator Cost /Hour: <br />$37.41 <br />NA <br />Total unit Cost /Hour: $319.93 <br />Total Fleet Cost/Hour: $1,279.71 <br />MATERIAL QUANTITIES <br />Initial Volume: 3,630 <br />Swell factor: 1.165 <br />Loose volume: 4,229 LCY <br />Source of estimated volume: Map 15 -1 <br />Source of estimated swell Cat Handbook <br />factor: <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly <br />production: <br />100 feet <br />1 ,718.9 LCY/hr <br />Materials consistency description: Compacted fill or embankment 0.9 <br />Average push gradient: <br />Average site altitude: <br />Material weight: <br />0% <br />6.000 feet <br />900 lbs /LCY <br />Weight description: Decomposed rock - 50% Rock, 50% Earth <br />Job Condition Correction Factor Source <br />Operator Skill: 0.750 (AVG.) <br />