Laserfiche WebLink
Bowie No. 2 Mine <br />Task description: <br />Site: Bowie No. 2 Mine <br />Reclamation Cost Estimate RN -3 Page 13 of 312 <br />BULLDOZER WORK <br />Regrade Utility Corridor <br />Permit Action: Permit Renewal 3 Permit /Job #: C1996083 <br />PROJECT IDENTIFICATION <br />Task #: 004 State: Colorado <br />Date: 1/16/2013 County: Delta <br />User: SLB <br />Agency or organization name: DBMS <br />HOURLY EOUIPMENT COST <br />Basic Machine: <br />Cat D l OT - IOSU <br />Horsepower: <br />574 <br />Blade Type: <br />Semi - Universal <br />Attachment: <br />NA <br />Shift Basis: 1 per day <br />Data Source: (CRG) <br />Cost Breakdown: <br />Abbreviation: None <br />Filename: C083 -004 <br />Total unit Cost /Hour: $319.93 <br />Total Fleet Cost /Hour: $1,279.71 <br />MATERIAL QUANTITIES <br />Utilization % <br />Ownership Cost /Hour: <br />$99.15 <br />NA <br />Operating Cost/Hour: <br />$183.36 <br />100 <br />Ripper op. Cost/Hour: <br />$0.00 <br />0 <br />Operator Cost /Hour: <br />$37.41 <br />NA <br />Total unit Cost /Hour: $319.93 <br />Total Fleet Cost /Hour: $1,279.71 <br />MATERIAL QUANTITIES <br />Initial Volume: <br />13,386 <br />Swell factor: <br />1.000 <br />Loose volume: <br />13,386 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell Cat Handbook <br />factor: <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly <br />production: <br />100 feet <br />1,718.9 LCY/hr <br />Materials consistency description: Partly consolidated stockpile 1.1 <br />Average push gradient: 0% <br />Average site altitude: 6,500 feet <br />Material weight: 2,900 lbs /LCY <br />Weight description: Decomposed rock - 50% Rock, 50% Earth <br />Job Condition Correction Factor Source <br />Operator Skill: 0.750 (AVG.) <br />