Laserfiche WebLink
Bulldozer Worksheet Cont'd Task # 001 Page 2 of 2 <br />Visibility: <br />Job efficiency: <br />Spoil pile: <br />Push gradient: <br />Altitude: <br />Material Weight: <br />Blade type: <br />1.000 <br />AVG. <br />0.830 <br />(1 SHIFT/DAY) <br />0.800 <br />(FND -RF) <br />1.329 <br />(CAT HB) <br />1.000 <br />(CAT HB) <br />0.793 <br />(CAT HB) <br />1.000 <br />(PAT) <br />Net correction: 0.4724 <br />Adjusted unit production: 768.59 LCY/hr <br />Adjusted fleet production: 768.59 LCY /hr <br />JOB TIME AND COST <br />Fleet size: 1 Dozer(s) <br />Unit cost: $0.268/LCY <br />Total job time: <br />Total job cost: <br />8.22 Hours <br />$1,694.84 <br />URCES Cost Estimating Soft%= <br />