Laserfiche WebLink
RECEIVED <br />/\ \ MAR 2 0 2014 <br />Division of Reclamation. <br />112 Annual Report Mining & Safety <br />Page 2 of 3 <br />Permittee Name: <br />Occidental Oil Shale, Inc. <br />Permit Number: <br />M- 1977424 <br />Operation Name: <br />Logan Wash <br />County: <br />Garfield <br />Annual Fee Due: <br />Permit Acreage: <br />$633.00 <br />108.55 <br />Anniversary Date: <br />Current Bond Amt: <br />March 28, 2014 <br />$570,428.00 <br />According to C.R.S. 34- 32.5 -116 or 34 -32 -116, each year, on the anniversary date of the permit, an operator shall submit <br />the Annual Fee, an Annual Report and Map showing the extent of current disturbances to affected land, required <br />monitoring information, reclamation accomplished to date and during the preceding year, any new disturbance that is <br />anticipated to occur during the upcoming year, any reclamation that will be performed during the upcoming year, the <br />dates for the beginning of active operations, and the date active operations ceased for the year. <br />Information contained in this report will be reviewed by the Division upon receipt and prior to the next compliance <br />inspection of the site. If, while completing this report, you learn that your site is not in compliance with the rules and the <br />act, it is advisable that the issues be rectified promptly to avoid possible enforcement action. <br />1. Is the site identification sign posted in accordance with Rule 3.1.12(1). NO <br />2. Is the affected area boundary clearly marked in accordance with Rule 3.1.12(2). ES NO <br />3. Is the mine site in final reclamation (all material extraction and stockpile removal is complete)? NO <br />If "YES," please note time limits related to completion of reclamation, Rule 3.1.3. <br />4. What was the date of last excavation, processing or hauling activity at the mine? ,� <br />5. Does the mine operate more than 180 days per year /v "—, it,, <br />If "NO ", please review Rule 1.l 3 to assure that your mine is in compliance. <br />6. Has this mine been granted: a) approval of TEMPORARY CESSATION Status? <br />b) approval for INTERMITTENT OPERATION? <br />7. Number of acres currently affected (mining incomplete and or unreleased reclamation). <br />8. Number of acres that were newly affected during the current report year. <br />9. Number of acres that were reclaimed durinf the current reyort ygr„ <br />�LcLC /•I /N�- c t .�: s6L r�/i�✓J E 7-174 <br />10. Estimated new acreage to be affected in the next report year. <br />11. Estimated acres to be reclaimed in the next report year. <br />12. Total acres in various stages of reclamation_ since ni-nnittwi mining antiu;tipe hAaan- <br />YES X10 <br />I &- NO <br />YES C, <br />Total acres <br />Total acres <br />Total acres <br />Total acres <br />backfilled: <br />3 / <br />seeded w/ <br />'.V/topsoil <br />j 3 <br />mulched w/ <br />approved mix: <br />approved mulch: <br />Total acres <br />Total acres <br />-replaced: <br />Topsoil <br />Mulch application <br />graded: <br />j /1. <br />fertilized w/ <br />replacement <br />j• <br />rate (tons): <br />I <br />a vd fertilizer: <br />depth (in.): <br />Seed <br />/-3z /rnI l:5-7- <br />Fertilizer <br />j�, .��;. ,— <br />Mulch <br />application <br />_ <br />�� "« �� <br />application <br />application <br />33/ .c.4� c, t� <br />method: <br />method: <br />method: <br />