Laserfiche WebLink
Task description: <br />Site: Liekskillet Claims <br />Page 1 of 2 <br />EQUIPMENT MOBILIZATION/DEMOBILIZATION <br />Haul reclamation equipment to and from job site <br />Permit Action: Routine bond update Permit/Job #: P2010005 <br />PROJECT IDENTIFICATION <br />Task #: 004 State: Colorado <br />Date: 3/17/2014 County: Conejos <br />User: WHE <br />Agency or organization name: DRMS <br />EQUIPMENT TRANSPORT RIG COST <br />Abbreviation: None <br />Filename: P005 -004 <br />Shift basis: 1 per day <br />Cost Data Source: CRG Data <br />Truck Tractor Description: GENERIC ON- HIGHWAY TRUCK TRACTOR, 6X4, DIESEL POWERED, <br />400 HP (2ND HALF, 2006) <br />Truck Trailer Description: GENERIC FOLDING GOOSENECK, DROP DECK EQUIPMENT TRAILER <br />(25T, 50T, AND 100T) <br />Cost Breakdown: <br />Available Rig Capacities <br />0 -25 Tons <br />26 -50 Tons <br />51+ Tons <br />Ownership Cost/Hour: <br />$16.63 <br />$18.37 <br />$2233 <br />eratin Cost/Hour: <br />$44.38 <br />$46.13 <br />$50.07 <br />Operator Cost/Hour: <br />$27.66 <br />$27.66 <br />$27.66 <br />.Helper Cost/Hour: <br />$0.00 <br />$25.39 <br />$25.39 <br />Total Unit Cost/Hour: <br />$88.67 <br />$117.55 <br />$125.45 <br />NON ROADABLE EQUIPMENT: <br />Machine <br />Weight/ <br />Owner ship <br />Haul Rig <br />Fleet <br />Haul Trip <br />Return Trip <br />DOT Permit <br />Description <br />Unit <br />Cost/hr/ unit <br />Cost/hr /unit <br />Size <br />Cost/hr/ <br />Cost/hr/ fleet <br />Cost/ fleet <br />TONS <br />fleet <br />Cat D6T <br />25.01 <br />$33.12 <br />$88.67 <br />1 <br />$121.79 <br />$88.67 <br />$250.00 <br />Subtotals: I 5121.79 $88.67 1 $250.00 <br />ROADABLE EQUIPMENT: <br />Machine Description <br />Total Cosvbr/ unit <br />Fleet Size <br />Haul Trip <br />Cost/br/ fleet <br />Return Trip <br />Cost/hr/ fleet <br />Light Duty Pickup, 4x4, 3/4 T. <br />$96.86 <br />1 <br />$96.86 <br />$96.86 <br />Subtotals: $96.86 $96.86 <br />CIRCES Cost Estimating Software <br />