My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-03-18_INSPECTION - P2010005
DRMS
>
Day Forward
>
Inspection
>
Prospect
>
P2010005
>
2014-03-18_INSPECTION - P2010005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:41:07 PM
Creation date
3/20/2014 8:48:34 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
P2010005
IBM Index Class Name
INSPECTION
Doc Date
3/18/2014
Doc Name
Inspection report
From
DRMS
To
Greg Cardova and Charles Valdez
Inspection Date
11/15/2013
Email Name
WHE
GRM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Bulldozer Worksheet Cont'd Task # 002 Page 2 of 2 <br />Visibility: <br />Job efficiency: <br />Spoil pile: <br />Push gradient: <br />Altitude: <br />Material Weight: <br />Blade type: <br />1.000 <br />AVG. <br />0.830 <br />(1 SHIFT/DAY) <br />0.800 <br />(FND -RF) <br />1.000 <br />(CAT HB) <br />1.000 <br />(CAT HB) <br />0.902 <br />(CAT HB) <br />1.000 <br />(PAT) <br />Net correction 0.4492 <br />Adjusted unit production: 199.71 LCY/hr <br />Adjusted fleet production: 199.71 LCY/hr <br />JOB TIME AND COST <br />Fleet size: 1 Dozer(s) <br />Unit cost: $0.6431LCY <br />Total job time: <br />Total job cost: <br />0.25 Hours <br />$32.17 <br />CIRCES Cost Estimating SoNare <br />
The URL can be used to link to this page
Your browser does not support the video tag.