Laserfiche WebLink
2.03.8 Permit Term Information <br />(1) Surface mining activities (open pit or strip mining) are not planned within the <br />permit area. <br />(2) The construction of the surface facilities will be delayed until the coal market <br />improves. Approximately 38.1 acres will be affected and disturbed during the <br />life of the operation. Since no underground mining will take place, affected <br />and disturbed acreage will be the same. <br />(3) The Applicant will conduct loadout operations in excess of 5 years. The <br />applicant requests a permit term of five years. <br />TR -02 2.03 -8 11/13 <br />