Laserfiche WebLink
6 (FORM 2 - Public filing) <br />8. Describe the estimated topsoil depth and how topsoil will be salvaged, stockpiled and redistributed for the re- establishment of <br />vegetation. Specify approximate topsoil redistribution depth: <br />No soils to be disturbed. All work to be done performed on "rock glacier ". <br />9. Describe how drill holes will be plugged (refer to Rule 5.4 of the Rules for required abandonment procedures): <br />We do not anticipate intersecting the water table, or have artesian out flow. Our plan is to <br />securely cap the wells as per rule 5.4.2 -5 under abandonment of exploration drill holes. <br />10. Describe how portals, adits, shafts, ponds, excavations, or other disturbances will be reclaimed (refer to Rule 3 and Rule 5 for <br />specific reclamation performance standards). You may wish to contact the Division for closure specifications. <br />Drill sites: Sites will be re- graded to their original contours and re- vegetated as <br />recommended by the Forest Service. <br />11. Describe how roads will be reclaimed or returned to their pre - prospecting (or better) condition: <br />The roads will he re graded to their natural contours as recommended by the Forest <br />Service. <br />