Laserfiche WebLink
4 (FORM 2 - Public f ling) <br />11. Describe proposed surface excavation or other land disturbance, including roads, pits, trenches, waste piles, drill pads and <br />collar areas of underground workings, ponds, etc... <br />Rotary drilling, maintenance and construction of access road to proposed drill pads that will be <br />initiated on or about June 15, 2014, weather and road condition permitting. <br />12. Proposed Disturbance (approximate) Describe the proposed drilling to be conducted, including anticipated number of holes, <br />diameter, depth, location, etc... Submit additional pages if necessary: <br />A. Drill Pads: Quantity 2.00 Average Width 15.00 (ft) Average Length 40.00 (ft) <br />B. Drill Holes: Quantity 2.00 Depth 1,000.00 (ft) Diameter 4.00 (in) <br />C. Mud Pits: Quantity Average Width (ft) Average Length (ft) <br />Average Depth (ft) <br />Described proposed underground work, including reopening of old workings, advancement of adits or shafts, <br />trenches, pits, cuts, rock dumps, or other types of disturbance, describe type, quantity and general dimensions: <br />F. Other Disturbances (please describe): <br />Do not anticipate any other. Our plan is to work from the road, including placement of drill <br />pads on road. <br />G. Indicate Chemicals and Fuels used or stored on site. List type, quantity and method to store. <br />Not anticipating storage of fuels onsit , beyond the OEM equipment & vehicles diesel fuel <br />tanks <br />F. NewRoad(s): Length 2,000.00 (ft) Width 10.00 (ft) <br />Significantly Upgraded Road(s) Length (ft) Width (ft) <br />Are culverts or other crossings proposed? If so, please describe: <br />None <br />