Laserfiche WebLink
MINE PERMIT BOUNDARY <br />2013 TOPSOIL STOCKPILES. (in cubic Yard. i <br />REQUIRED TOPSOIL Non - Morgan (in cubic Yardsl <br />ZONE 6 -106.8 ACRES <br />10,590 <br />Pre 95 Liftl AREAL Stockpile <br />ZONE 7 -100.6 ACRES <br />ZONE 8 - 2.83 acres <br />SUBSOIL: BENCH 1 SURFACE SPOIL <br />Stockpile <br />- 200 <br />Pre 95 Liftl AREAL Required Fill <br />SUBSOIL: BENCH 1 SURFACE SPOIL <br />SUBSOIL: BENCH 1 SURFACE <br />SPOIL <br />30"+ THICKNESS <br />ID Amount Stockpile Type <br />10,390 <br />Pre 95 Liftl AREAL Balance <br />24"+ THICKNESS <br />18 "t THICKNESS <br />1. 6,260 Pre 96 Luti -AREAS <br />TOPSOIL: MIXED TOPSOIL <br />2. 4,330 Pre 95 Lifts -AREA2 Pre 96 Lift1- AREA1 +2 Total 10.590 <br />TOPSOIL: MIXED TOPSOIL <br />TOPSOIL: MIXED TOPSOIL <br />15 -24" (21'• AVG.) THICKNESS <br />3. 41,760 Pre 95 Lift2 -AREA2 Pre 95 Lift2 -AREA2 Total 41.760 <br />41,760 <br />Pre Lift2 AREAL Stockpile <br />12 -20" THICKNESS 13" AVG.: <br />( ) <br />38" THICKNESS <br />4. 5,015 Pre 95 Mixed -AREAS <br />- 400 <br />Pre LiPif AREA1 Required Fill <br />5. 2,990 Pre 95 Mixed -AREAS <br />41,360 <br />Pre Lift2 AREAL Balance <br />an+ sUSSOII. <br />PoR9 sa <br />8. 22,740 Pre 96 Mixed -AREAS <br />' <br />N em000 <br />1 <br />7. 35,280 Pre 96 Mixed -AREAS Pre 95 Mixed - AREA3 Total 66.025 <br />N °pS'0p0 <br />8. 9,600 Mixed -Zone 8 Mixed -Zone 8 Total 9.600 <br />66,025 <br />Pre 95 MIxed AREA2 &3 Stockpile <br />9. 7,050 Mixed -Zone 7 <br />-47.96 <br />Pre 95 Mixed AREA2 &3 Required Fill <br />*e <br />10. 37,530 Mixed -Zone 7 <br />18,065 <br />Pre 95 Mix AREA2 &3 Balance <br />11. 24,180 Mixed -Zone 7 <br />- <br />12. 61,950 Mixed -Zone 7 <br />13. 7,450 Mixed -Zone 7 Mixed -Zone 7 Total 13816 <br />14. 123,300 Morgan Mixed <br />138,160 <br />Zone 7 Mixed Stockpile Total <br />2013 TOPSOIL <br />0 <br />STOCKPILES <br />- 138,196 <br />Zone 7 Mixed Min. Required Fill - l.lft DEPTH <br />15. 10,680 Morgan Mixed Total Morgan Mixed 133.980 <br />-36 <br />Zone 7 Mixed Balance <br />(Typical) <br />16. 413,450 Morgan BLift Total Morgan BLift 413.450 <br />e <br />E <br />3346 cy <br />STOIC DE <br />10 <br />17. 187,370 Morgan ALift <br />TOPSOIL AREA <br />18. 9,260 Morgan ALift <br />9,800 <br />Zone 8 Mixed Stockpile Total <br />0.0 <br />0.0 AC <br />100.6 AC <br />1 z6e cy <br />c[� a <br />19, 17,470 Morgan ALift Total Morgan ALift 214.100 <br />�¢,¢�,$ <br />Zone 8 Mixed Required Fill - 3.2ft DEPTH <br />8TOC8 cy 12 23,271 ey <br />- <br />- <br />-4 828 <br />Zone 8 -Mixed Balance <br />STOCKPILE f1 <br />-- <br />NON- MORGAN TOPSOIL REPLACEMENT CALCULATIONS <br />64,951 2013 TOTAL EOY TOPSOIL BALANCE (Non- Morgan) <br />N.N WO <br />AREA OR ZONE SQFT & DEPTH CUYD's <br />-------------------------------------- <br />N WRW <br />NO TOPSOIL PLACEMENT 77.9 AC <br />PRE 95 LIFT 1 -AREAL 10,790 +0.5/27 200 Total 200 <br />MORGAN <br />TOPSOIL BALANCE (In cubic Yarde) <br />IN 2013: NO <br />TOPSOIL SAMPLED <br />PRE 95 LIFT 2 -AREAL 10,790'1.0/27 400 Total <br />PRE 95 Mixed ARM 629,516'0.8/27 18,652 <br />133,980 <br />TOPSOIL Stockpile MIXED <br />PRE 96 Mixed AREAS 791,316*1.0/27 29,308 Total 47.960 <br />- 131,238 <br />TOPSOIL Required Fill MIXED <br />ZONE 7 (MIXED) 3,392,093.1.1/27 138,196 Total 138.196 <br />2,742 <br />MIXED Balanced <br />m <br />ZONE 8 (PF MDIED)123,275 *3.16/27 14,428 Total 14.42 <br />MORGAN TOPSOIL REPLACEMENT CALCULATIONS <br />413,450 <br />TOPSOIL Stockpile B Lift <br />ZONE SQFT & DEPTH CUYD's <br />- 361,871 <br />TOPSOIL Required Fill B Lift <br />I(MIXED) 340,247.0.3/27 3,781 <br />51,579 <br />B Lift Balanced <br />2(MIXED) 531,868 *1.8/27 35,458 <br />Pond 016 <br />- <br />os1 sU�. n <br />3 MIXED 1,379,992*1.8 27 91,999 Total 131.238 <br />3( MIXED) / <br />214,100 <br />TOPSOIL Stockpile A Lift <br />164,543 CU::^- J <br />3(B LIFT 1,379,992*2.75 27 140,555 <br />( ) / <br />= 160,957 <br />TOPSOIL Required Fill A Lift <br />NH2 PERMIT <br />BOUNDARY `' <br />4(B LIFT) 2,172,916'2.75/27 221,316 Total 361.871 <br />53,143 <br />A Lift Balanced <br />4(A LIFT) 2,172,916*2.0/27 160,957 Total 160.957 <br />N WI= <br />N W,ACO <br />107,464 <br />2013 TOTAL EOY MORGAN SOIL BALANCE <br />9,410 Cy <br />8,288 cY <br />STOCK PILE 9 <br />STOCKPILE 13 <br />if <br />^11111 <br />379,770 cy <br />a <br />II <br />STOCKPILE 16 <br />8,379 Cy <br />arm im 1 o 0 <br />1 <br />�' <br />I U 1 II <br />STOCEPI.E 16 <br />r <br />11 1 <br />2013 ZONE 4 <br />/ <br />xroccAREA <br />�' <br />Fa <br />TOPSOIL AREA <br />0 <br />1 -PRE 95 LIFT 1 = <br />ffiW AREA 1 -PRE 96 LIFT 2 - <br />zoo cy ® 0.54E <br />400 cy 0 I.Oft <br />// <br />L��J <br />8,288 cy <br />ILE 17 <br />N eoaaoo <br />N W0000 <br />125,075 cy <br />STOCKPILE 14 <br />AREA 2 -PRE 96 MIXED <br />TOPSOIL NEEDED <br />I� <br />p <br />MOED - 14.126. cy <br />ZONE2 ZONE 1 <br />8,747oy <br />12.21 AC 7.81 AC <br />117® 22,740 cy <br />STOCKPILE <br />ZONE 1 -7.81 ACRES <br />SUBSOIL: BENCH 1 SURFACE SPOIL <br />33 "+ THICKNESS <br />Dl \fig \Oy Or, r�,� 0� ipylP�101 <br />TOPSOIL: CURRENTLY HAS -17" OF <br />MIXED TOPSOIL. 4" MORE WILL BE <br />ADDED FOR A 21" AVG. THICKNESS <br />14 24 <br />sTOC <br />ILE 19 <br />ZONE 3 -31.68 ACRES <br />WITH A COMBINED THICKNESS OF 54" <br />• -_ - <br />ZONE 5 <br />SUBSOIL: LIFT B TOPSOIL <br />- <br />N <br />1.90AC <br />33 "+ THICKNESS <br />ZONE 2 -12.21 ACRES <br />N W= <br />(UNDISTURBED) <br />SUBSOIL: BENC 1 SURFACE SPOIL <br />ZONE 4 <br />ZONE 4 - 54.33 ACRES <br />ZONE 3 <br />TOPSOIL: MIXED TOPSOIL <br />33 "++THICKNESSH <br />Pre 95 M= - 35,280 ey <br />54.33 AC <br />SUBSOIL: LIFT B TOPSOIL <br />31.68 AC <br />21" AVG. THICKNESS WITH A <br />TOTAL <br />33"+ THICKNESS <br />COMBINED THICKNESS OF 54 " <br />TOPSOIL: MIXED TOPSOIL <br />21" AVG. THICKNESS WITH A <br />TOPSOIL: A LIFT TOPSOIL <br />COMBINED THICKNESS OF 54" $ <br />24" AVG. THICKNESS WITH A <br />m <br />COMBINED THICKNESS OF 57" <br />I <br />c <br />°" m❑ <br />" <br />POND 007 <br />III <br />IN Wx.aao <br />_ I <br />N Waldo <br />Pre 96 LIFT 1 <br />�V <br />ermaa <br />-• <br />i O <br />Pre 95 MIKED = 5,015 cy <br />AREA 3- PRE 95 MIXED <br />TOPS I= 29EDE cy <br />Fr.1.r.RPrLRT <br />2 - 41,760 cy <br />xenaW <br />N W .WQ <br />1 <br />200 0 400 800 <br />r <br />Pr�1 96 6 LIFT 1 = 6,2(50.y <br />scur iN �. <br />qT <br />EXHIBIT 2013 -10 <br />ESTERN FUELS - COLORADO <br />re 96 MIRED - 2,990 cy <br />A LIMITED LIABILITY COMPANY <br />- s <br />NEW HORIZON 2 MINE <br />P.0 Box 628, NUCIq CO. 81424 <br />2013 TOPSOIL BALANCE <br />N W40x1 <br />� <br />p <br />tlt <br />8 <br />`d <br />p <br />y <br />p <br />q � <br />� <br />p }� <br />� R <br />pg 9 <br />q $ <br />C8 <br />y <br />w aNxx <br />NNa are, <br />w.. w <br />. °R1N'W <br />WNI. Ma <br />NIY. MIC <br />� <br />Q <br />NN Ff <br />e3S <br />NNROM <br />Nla Nat <br />L GUBK4, P.E. <br />M: \DATA \ACRD \reo -repo \2013\ <br />2013_NB2 COMP.deR <br />