MINE PERMIT BOUNDARY
<br />2013 TOPSOIL STOCKPILES. (in cubic Yard. i
<br />REQUIRED TOPSOIL Non - Morgan (in cubic Yardsl
<br />ZONE 6 -106.8 ACRES
<br />10,590
<br />Pre 95 Liftl AREAL Stockpile
<br />ZONE 7 -100.6 ACRES
<br />ZONE 8 - 2.83 acres
<br />SUBSOIL: BENCH 1 SURFACE SPOIL
<br />Stockpile
<br />- 200
<br />Pre 95 Liftl AREAL Required Fill
<br />SUBSOIL: BENCH 1 SURFACE SPOIL
<br />SUBSOIL: BENCH 1 SURFACE
<br />SPOIL
<br />30"+ THICKNESS
<br />ID Amount Stockpile Type
<br />10,390
<br />Pre 95 Liftl AREAL Balance
<br />24"+ THICKNESS
<br />18 "t THICKNESS
<br />1. 6,260 Pre 96 Luti -AREAS
<br />TOPSOIL: MIXED TOPSOIL
<br />2. 4,330 Pre 95 Lifts -AREA2 Pre 96 Lift1- AREA1 +2 Total 10.590
<br />TOPSOIL: MIXED TOPSOIL
<br />TOPSOIL: MIXED TOPSOIL
<br />15 -24" (21'• AVG.) THICKNESS
<br />3. 41,760 Pre 95 Lift2 -AREA2 Pre 95 Lift2 -AREA2 Total 41.760
<br />41,760
<br />Pre Lift2 AREAL Stockpile
<br />12 -20" THICKNESS 13" AVG.:
<br />( )
<br />38" THICKNESS
<br />4. 5,015 Pre 95 Mixed -AREAS
<br />- 400
<br />Pre LiPif AREA1 Required Fill
<br />5. 2,990 Pre 95 Mixed -AREAS
<br />41,360
<br />Pre Lift2 AREAL Balance
<br />an+ sUSSOII.
<br />PoR9 sa
<br />8. 22,740 Pre 96 Mixed -AREAS
<br />'
<br />N em000
<br />1
<br />7. 35,280 Pre 96 Mixed -AREAS Pre 95 Mixed - AREA3 Total 66.025
<br />N °pS'0p0
<br />8. 9,600 Mixed -Zone 8 Mixed -Zone 8 Total 9.600
<br />66,025
<br />Pre 95 MIxed AREA2 &3 Stockpile
<br />9. 7,050 Mixed -Zone 7
<br />-47.96
<br />Pre 95 Mixed AREA2 &3 Required Fill
<br />*e
<br />10. 37,530 Mixed -Zone 7
<br />18,065
<br />Pre 95 Mix AREA2 &3 Balance
<br />11. 24,180 Mixed -Zone 7
<br />-
<br />12. 61,950 Mixed -Zone 7
<br />13. 7,450 Mixed -Zone 7 Mixed -Zone 7 Total 13816
<br />14. 123,300 Morgan Mixed
<br />138,160
<br />Zone 7 Mixed Stockpile Total
<br />2013 TOPSOIL
<br />0
<br />STOCKPILES
<br />- 138,196
<br />Zone 7 Mixed Min. Required Fill - l.lft DEPTH
<br />15. 10,680 Morgan Mixed Total Morgan Mixed 133.980
<br />-36
<br />Zone 7 Mixed Balance
<br />(Typical)
<br />16. 413,450 Morgan BLift Total Morgan BLift 413.450
<br />e
<br />E
<br />3346 cy
<br />STOIC DE
<br />10
<br />17. 187,370 Morgan ALift
<br />TOPSOIL AREA
<br />18. 9,260 Morgan ALift
<br />9,800
<br />Zone 8 Mixed Stockpile Total
<br />0.0
<br />0.0 AC
<br />100.6 AC
<br />1 z6e cy
<br />c[� a
<br />19, 17,470 Morgan ALift Total Morgan ALift 214.100
<br />�¢,¢�,$
<br />Zone 8 Mixed Required Fill - 3.2ft DEPTH
<br />8TOC8 cy 12 23,271 ey
<br />-
<br />-
<br />-4 828
<br />Zone 8 -Mixed Balance
<br />STOCKPILE f1
<br />--
<br />NON- MORGAN TOPSOIL REPLACEMENT CALCULATIONS
<br />64,951 2013 TOTAL EOY TOPSOIL BALANCE (Non- Morgan)
<br />N.N WO
<br />AREA OR ZONE SQFT & DEPTH CUYD's
<br />--------------------------------------
<br />N WRW
<br />NO TOPSOIL PLACEMENT 77.9 AC
<br />PRE 95 LIFT 1 -AREAL 10,790 +0.5/27 200 Total 200
<br />MORGAN
<br />TOPSOIL BALANCE (In cubic Yarde)
<br />IN 2013: NO
<br />TOPSOIL SAMPLED
<br />PRE 95 LIFT 2 -AREAL 10,790'1.0/27 400 Total
<br />PRE 95 Mixed ARM 629,516'0.8/27 18,652
<br />133,980
<br />TOPSOIL Stockpile MIXED
<br />PRE 96 Mixed AREAS 791,316*1.0/27 29,308 Total 47.960
<br />- 131,238
<br />TOPSOIL Required Fill MIXED
<br />ZONE 7 (MIXED) 3,392,093.1.1/27 138,196 Total 138.196
<br />2,742
<br />MIXED Balanced
<br />m
<br />ZONE 8 (PF MDIED)123,275 *3.16/27 14,428 Total 14.42
<br />MORGAN TOPSOIL REPLACEMENT CALCULATIONS
<br />413,450
<br />TOPSOIL Stockpile B Lift
<br />ZONE SQFT & DEPTH CUYD's
<br />- 361,871
<br />TOPSOIL Required Fill B Lift
<br />I(MIXED) 340,247.0.3/27 3,781
<br />51,579
<br />B Lift Balanced
<br />2(MIXED) 531,868 *1.8/27 35,458
<br />Pond 016
<br />-
<br />os1 sU�. n
<br />3 MIXED 1,379,992*1.8 27 91,999 Total 131.238
<br />3( MIXED) /
<br />214,100
<br />TOPSOIL Stockpile A Lift
<br />164,543 CU::^- J
<br />3(B LIFT 1,379,992*2.75 27 140,555
<br />( ) /
<br />= 160,957
<br />TOPSOIL Required Fill A Lift
<br />NH2 PERMIT
<br />BOUNDARY `'
<br />4(B LIFT) 2,172,916'2.75/27 221,316 Total 361.871
<br />53,143
<br />A Lift Balanced
<br />4(A LIFT) 2,172,916*2.0/27 160,957 Total 160.957
<br />N WI=
<br />N W,ACO
<br />107,464
<br />2013 TOTAL EOY MORGAN SOIL BALANCE
<br />9,410 Cy
<br />8,288 cY
<br />STOCK PILE 9
<br />STOCKPILE 13
<br />if
<br />^11111
<br />379,770 cy
<br />a
<br />II
<br />STOCKPILE 16
<br />8,379 Cy
<br />arm im 1 o 0
<br />1
<br />�'
<br />I U 1 II
<br />STOCEPI.E 16
<br />r
<br />11 1
<br />2013 ZONE 4
<br />/
<br />xroccAREA
<br />�'
<br />Fa
<br />TOPSOIL AREA
<br />0
<br />1 -PRE 95 LIFT 1 =
<br />ffiW AREA 1 -PRE 96 LIFT 2 -
<br />zoo cy ® 0.54E
<br />400 cy 0 I.Oft
<br />//
<br />L��J
<br />8,288 cy
<br />ILE 17
<br />N eoaaoo
<br />N W0000
<br />125,075 cy
<br />STOCKPILE 14
<br />AREA 2 -PRE 96 MIXED
<br />TOPSOIL NEEDED
<br />I�
<br />p
<br />MOED - 14.126. cy
<br />ZONE2 ZONE 1
<br />8,747oy
<br />12.21 AC 7.81 AC
<br />117® 22,740 cy
<br />STOCKPILE
<br />ZONE 1 -7.81 ACRES
<br />SUBSOIL: BENCH 1 SURFACE SPOIL
<br />33 "+ THICKNESS
<br />Dl \fig \Oy Or, r�,� 0� ipylP�101
<br />TOPSOIL: CURRENTLY HAS -17" OF
<br />MIXED TOPSOIL. 4" MORE WILL BE
<br />ADDED FOR A 21" AVG. THICKNESS
<br />14 24
<br />sTOC
<br />ILE 19
<br />ZONE 3 -31.68 ACRES
<br />WITH A COMBINED THICKNESS OF 54"
<br />• -_ -
<br />ZONE 5
<br />SUBSOIL: LIFT B TOPSOIL
<br />-
<br />N
<br />1.90AC
<br />33 "+ THICKNESS
<br />ZONE 2 -12.21 ACRES
<br />N W=
<br />(UNDISTURBED)
<br />SUBSOIL: BENC 1 SURFACE SPOIL
<br />ZONE 4
<br />ZONE 4 - 54.33 ACRES
<br />ZONE 3
<br />TOPSOIL: MIXED TOPSOIL
<br />33 "++THICKNESSH
<br />Pre 95 M= - 35,280 ey
<br />54.33 AC
<br />SUBSOIL: LIFT B TOPSOIL
<br />31.68 AC
<br />21" AVG. THICKNESS WITH A
<br />TOTAL
<br />33"+ THICKNESS
<br />COMBINED THICKNESS OF 54 "
<br />TOPSOIL: MIXED TOPSOIL
<br />21" AVG. THICKNESS WITH A
<br />TOPSOIL: A LIFT TOPSOIL
<br />COMBINED THICKNESS OF 54" $
<br />24" AVG. THICKNESS WITH A
<br />m
<br />COMBINED THICKNESS OF 57"
<br />I
<br />c
<br />°" m❑
<br />"
<br />POND 007
<br />III
<br />IN Wx.aao
<br />_ I
<br />N Waldo
<br />Pre 96 LIFT 1
<br />�V
<br />ermaa
<br />-•
<br />i O
<br />Pre 95 MIKED = 5,015 cy
<br />AREA 3- PRE 95 MIXED
<br />TOPS I= 29EDE cy
<br />Fr.1.r.RPrLRT
<br />2 - 41,760 cy
<br />xenaW
<br />N W .WQ
<br />1
<br />200 0 400 800
<br />r
<br />Pr�1 96 6 LIFT 1 = 6,2(50.y
<br />scur iN �.
<br />qT
<br />EXHIBIT 2013 -10
<br />ESTERN FUELS - COLORADO
<br />re 96 MIRED - 2,990 cy
<br />A LIMITED LIABILITY COMPANY
<br />- s
<br />NEW HORIZON 2 MINE
<br />P.0 Box 628, NUCIq CO. 81424
<br />2013 TOPSOIL BALANCE
<br />N W40x1
<br />�
<br />p
<br />tlt
<br />8
<br />`d
<br />p
<br />y
<br />p
<br />q �
<br />�
<br />p }�
<br />� R
<br />pg 9
<br />q $
<br />C8
<br />y
<br />w aNxx
<br />NNa are,
<br />w.. w
<br />. °R1N'W
<br />WNI. Ma
<br />NIY. MIC
<br />�
<br />Q
<br />NN Ff
<br />e3S
<br />NNROM
<br />Nla Nat
<br />L GUBK4, P.E.
<br />M: \DATA \ACRD \reo -repo \2013\
<br />2013_NB2 COMP.deR
<br />
|