Laserfiche WebLink
-4- <br />12. Primary future (Post- minine) land use (check one): <br />11 Cropland(CR) Pastureland(PL) <br />Rangeland(RL) Forestry(FR) <br />Residential(RS) 17 Recreation(RC) <br />ZIDeveloped Water Resources(WR) <br />13. Primary present land use (check one): <br />0 Cropland(CR) Pastureland(PL) <br />l Rangeland(RL) Forestry(FR) <br />Residential(RS) Recreation(RC) <br />Developed Water Resources(WR) <br />General Agriculture(GA) <br />Wildlife Habitat(WL) <br />Industrial /Commercial(IC) <br />Solid Waste Disposal(WD) <br />General Agriculture(GA) <br />Wildlife Habitat(WL) <br />E jIndustrial /Commercial(IC) <br />14. Method of Mining: Briefly explain mining method (e.g. truck/shovel): <br />Gravel caps will be removed by use of loaders, dozers or excavators and carried to a crushing and screening plant. <br />15. On Site Processing: 177 Crushing /Screening <br />13.1 Briefly explain mining method (e.g. truck/shovel): <br />The material will be processed by crushing, screening and washing to prepare for transport. <br />List any designated chemicals or acid - producing materials to be used or stored within permit area: <br />None <br />16. Description of Amendment or Conversion: <br />If you are amending oc converting an existing operation, provide a brief narrative describing the proposed ebange(s). <br />This amendment is to allow for 200 acres of disturbance rather than the currently permitted 100 <br />acres. Please see the attached cover letter for a complete description of the proposed changes. <br />