My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-03-13_PERMIT FILE - P2014004 (3)
DRMS
>
Day Forward
>
Permit File
>
Prospect
>
P2014004
>
2014-03-13_PERMIT FILE - P2014004 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/27/2021 3:35:28 PM
Creation date
3/14/2014 1:46:56 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
P2014004
IBM Index Class Name
PERMIT FILE
Doc Date
3/13/2014
Doc Name
NOI Application - Form 2
From
Winding Stair Resources, LLC
To
DRMS
Email Name
GRM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6 (FORM 2 - Public filing) <br />8. Describe the estimated topsoil depth and how topsoil will be salvaged, stockpiled and redistributed for the re- establishment of <br />vegetation. Specify approximate topsoil redistribution depth: <br />Sites are described as rocky in general. Approximately 4" of topsoil is expected to be <br />encountered. Any topsoil disturbed will be stockpiled on location and redistributed over <br />each rac mounted n site during rec ama ion. <br />9. Describe how drill holes will be plugged (refer to Rule 5.4 of the Rules for required abandonment procedures): <br />Any cuttings (mineralized first) are to be returned into the hole to the extent possible when <br />drilling is complete. Each drill hole will be plugged with spray foam or concrete from five <br />feet to within tWo feet of e su ace and filled with native topsoil prior to drilling ne <br />ioest-en. Drill sete areas will be raked and fn*xed with surfaee tepsoil and seeded. A" <br />damand_core will be rued from site <br />10. Describe how portals, adits, shafts, ponds, excavations, or other disturbances will be reclaimed (refer to Rule 3 and Rule 5 for <br />specific reclamation performance standards). You may wish to contact the Division for closure specifications. <br />No adits, shafts, ponds will be created by this project. <br />The topsoil will be bermed on the lowest side of the drill site locations. <br />11. Describe how roads will be reclaimed or returned to their pre - prospecting (or better) condition: <br />No ro2d d*sturb2nce is expected Any disturbance an fla - t ground leading to droll sites will <br />be reclaimed by application of an approved seeding mixture and fertilization. <br />
The URL can be used to link to this page
Your browser does not support the video tag.