My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-03-13_PERMIT FILE - C1996083A
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1996083A
>
2014-03-13_PERMIT FILE - C1996083A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:40:58 PM
Creation date
3/14/2014 1:10:34 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083A
IBM Index Class Name
Permit File
Doc Date
3/13/2014
Doc Name
Reclamation Cost Estimate
Section_Exhibit Name
Volume I 3.02.2 Reclamation Cost Estimate RN3
Media Type
D
Archive
Yes
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
337
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COST SUMMARY WORK <br /> Task description: MR-148 net after concrete sub.for pavement <br /> Permit Action: Minor Revision <br /> Site: Bowie No.2 Mine 148 Permit/Job#: C1996083 <br /> PROJECT IDENTIFICATION <br /> Task#: OOG State: Colorado Abbreviation: None <br /> Date: 3/12/2014 County: Delta Filename: C083-OOG <br /> User: SLB <br /> Agency or organization name: DRMS <br /> TASK LIST(DIRECT COSTS) <br /> Task Form Fleet Task <br /> Description Used Size Hours Cost <br /> 355 Remove concrete patch on haul road DEMOLISH 1 0.00 $1,932.56 <br /> 356 Credit for pavement removal NA 1 0.00 ($772.59) <br /> SUBTOTALS: 0 $1,159.97 <br /> INDIRECT COSTS <br /> OVERHEAD AND PROFIT: <br /> Liability insurance: 2.02% Total= $23.43 <br /> Performance bond: 1.05% Total= $12.18 <br /> Job superintendent: 0.00 hrs Total= $0.00 <br /> Profit: 10.00% Total= $116.00 <br /> TOTAL O&P= $151.61 <br /> CONTRACT AMOUNT(direct+O&P)= $1,311.58 <br /> LEGAL-ENGINEERING-PROJECT MANAGEMENT: <br /> Financial warranty processing(legal/related costs): 0.00 Total= 0.00 <br /> Engineering work and/or contract/bid preparation: 4.00% Total= $52.46 <br /> Reclamation management and/or administration: 3.13% $41.05 <br /> CONTINGENCY: 0.00 Total= $0.00 <br /> TOTAL INDIRECT COST= $245.13 <br /> TOTAL BOND AMOUNT(direct+indirect)= $1,405.10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.