Laserfiche WebLink
1. Grading and backfiIling the rim of the oval: dozer work to flatten slope to 2:1 or flatter: 376 feet, 0.17 <br />acres. <br />2. Spread of overburden /soil on disturbed areas. Originally there was 0 -4 inches of soil (bedding <br />material) estimated: this may have been optimistic, but by using overburden, 3-4 inches of bedding <br />material can be placed where useful, if areas with existing trees, brush and good stands of grass are <br />Old 110 Area (See <br />not disturbed. Soil is needed on less than 25% of the total area, including the 0.17 acres above, for a <br />Description to Left) <br />total of acres. <br />3. Revegetatio ation: seeding and other work on the 0.36 acres above plus an additional 0.88 acres, for a total <br />of 1.24 acres (which equals 33% of the total of 3.76 acres). Revegetation, seeding and other work will <br />not disturb good stands of pinyon, juniper, other brush, stands of grass and woody plants. <br />NO CHANGE 2013-14) <br />Stone Sand Gravel <br />15 FEET: Scale 1 660'on8.5x11paper <br />CURRENT WORKING AREA, INCLUDING OLD M1990 -025 AREA <br />Wallace Pit M1983-028 <br />Drawn by: NAB Checked by: KJS <br />1. 3.89 acres at final grade, some soil, used for plant and stockpile area. No <br />change in 2013 -14. <br />Annual Report Map 2014 <br />2. 4.52 acres disturbed (see conversion application for details), end of 2013. <br />3. Areas disturbed since area transferred to Stone S &G: acres. <br />East Portion <br />Nathan A. Barton, CE, PE, DEE, DATE: 16 AUG 2013 <br />