Laserfiche WebLink
TABLE OF CONTENTS <br />1.0 PROJECT DESCRIPTION .................................................................... ..............................1 <br />1.1 <br />Project Background .................................................................... ..............................1 <br />1.2 <br />Tailing Facility Design and Construction .................................. ..............................2 <br />1.3 <br />Tailing Facility Operation .......................................................... ..............................4 <br />1.4 <br />Existing Instrumentation and Monitoring Program ................... ..............................4 <br />2.0 INITIAL INSPECTION OBSERVATIONS ......................................... ..............................6 <br />2.1 <br />Operational Status During Inspection ........................................ ..............................6 <br />3.0 STRUCTURAL STABILITY ................................................................ ..............................7 <br />3.1 <br />Summary of Existing Data and Analysis ................................... ..............................7 <br />3. 1.1 Embankment Design ...................................................... ..............................7 <br />3.1.2 Results of Previous Studies ............................................ ..............................8 <br />3.1.3 Monitoring Data ............................................................ .............................10 <br />3.2 <br />Visual Assessment of Dam Stability ......................................... .............................10 <br />3.2.1 Slumps, Cracking and Settlement ................................. .............................11 <br />3.2.2 Erosion Gulley in Right Abutment Groin ..................... .............................12 <br />3.2.3 Drain Outlets ................................................................. .............................14 <br />3.2.4 Piezometers ................................................................... .............................16 <br />3.3 <br />Results of New Evaluations Performed as part of Detailed Inspection <br />Analysis..................................................................................... .............................16 <br />3.3.1 Steady Seepage Analyses .............................................. .............................16 <br />3.3.2 Static Stability ............................................................... .............................18 <br />3.3.3 Stability under Flood Loading ...................................... .............................18 <br />3.3.4 Stability under Earthquake Loading ............................. .............................20 <br />4.0 HYDROLOGY/HYDRAULICS .......................................................... .............................22 <br />4.1 <br />Summary of Existing Data and Analysis .................................. .............................22 <br />4. 1.1 Impoundment Elevation- Area - Volume ........................ .............................22 <br />4.1.2 Drainage Area and Runoff Conditions ......................... .............................24 <br />4.1.3 Existing Hydrologic/Hydraulic Design Data ................ .............................24 <br />4.1.4 Previous Design Analyses ............................................. .............................25 <br />San Luis Project Miller Geotechnical Consultants <br />Tailing Dam Data Report ii February 2014 <br />