My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-03-07_REVISION - M1988112 (3)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1988112
>
2014-03-07_REVISION - M1988112 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:40:49 PM
Creation date
3/11/2014 1:22:25 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1988112
IBM Index Class Name
REVISION
Doc Date
3/7/2014
Doc Name
Tailing dam report TR33
From
DRMS
To
McClure & Eggleston, LLC
Type & Sequence
TR33
Email Name
WHE
GRM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
73
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
of the flip bucket discharge. According to the Drawings, the plunge pool has a bottom width of 5 <br />ft, a minimum established depth of 2 ft and a design depth of 6 ft, and 2H:1 V side slopes. <br />Calculations for the PMF included with the documentation identified in paragraph 4.1 were <br />based on a rainfall event of 355.6 mm (14.0 inches). Using a Soil Conservation Service (SCS) <br />curve number of 70.0, for the total combined area contributing to the basin of 830 acres, the <br />calculations yielded an estimated runoff volume of 680 acre -feet, and a peak runoff discharge of <br />9,223 cfs. For events larger than the 100 -year storm up to a PMF event, the original operational <br />concept was that the South Diversion Ditch would overflow, allowing much of the PMF flows to <br />enter and be retained in the impoundment without overtopping the dam. The original hydrologic <br />analyses were completed with the computer program WASHED using an SCS type II rainfall <br />intensity curve. <br />4.2 INITIAL ASSESSMENT OF ADEQUACY OF FACILITY FOR FLOOD EVENTS <br />4.2.1 Flood Events Evaluated <br />An Inflow Design Flood (IDF) has not been established for this facility, as the facility is not <br />under the jurisdiction of the Colorado Division of Water Resources (DWR). For purposes of this <br />dam safety evaluation, hydrologic and hydraulic check analyses and potential failure modes <br />analysis were completed for two different flood events as follows: <br />• 100 -year event, which was the basis for the operational storm water diversion facilities <br />design; and <br />• Probable Maximum Flood (PMF) event, which was the basis for establishing dam <br />freeboard (non- overtopping) for the impoundment capacity. <br />4.2.2 South Diversion Ditch <br />Through field observations it was apparent that the South Diversion Ditch is not configured in <br />accordance with the generalized dimensions, geometry and slopes indicated in the design <br />calculations as summarized in the documentation cited in Section 4.1. Ample depth appears to <br />be present, but the slope of the channel invert varies and even reverses in some locations along <br />the ditch. To further evaluate the channel geometry, topographic mapping was developed based <br />on new field surveys performed in October 2013. The field survey data were augmented by use <br />of USGS LIDAR data in areas outside the limits of the field surveys. The data were then utilized <br />to develop CADD files from which cross - sections were cut for use in HEC -RAS modeling that <br />was used to determine actual channel capacity, flow velocities and depths. These analyses are <br />described in Section 4.3 of this report. The channel was found to have an irregular cross section <br />and slope with localized depressions, constrictions, high points and locations with lowered <br />embankments. These conditions were considered in the HEC -RAS modeling. <br />San Luis Project Miller Geotechnical Consultants <br />Tailing Dam Data Report 26 February 2014 <br />
The URL can be used to link to this page
Your browser does not support the video tag.