My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-03-10_ENFORCEMENT - C1981012
DRMS
>
Day Forward
>
Enforcement
>
Coal
>
C1981012
>
2014-03-10_ENFORCEMENT - C1981012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:40:50 PM
Creation date
3/11/2014 8:02:47 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981012
IBM Index Class Name
Enforcement
Doc Date
3/10/2014
Doc Name
Request for Review (Emailed)
From
Leigh Simmons
To
Susan Burgmaier
Violation No.
CV2013009
Email Name
SLB
LDS
SB1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
NECC believes that existing analysis as presented in Exhibit 20 with <br />additional run -off calculations as provided by TR -62 in Exhibit 19(19) for <br />two temporary culverts on ditch D -55 provide an sufficient information to <br />design D -55. The currently approved Table 20 D -55 lists D -55 as a riprapped <br />trapezoidal ditch with top a top width of 9.3 and depth of 1.6 feet. This <br />information has been deleted and Table 20 revised to reference the criteria <br />found in Exhibit 20, listing upper segments of D -55 as an un- riprapped V- <br />Shape ditch with a top -width of 12.3'by depth of 1.6' providing the same <br />cross - sectional area as the trapezoidal ditch. <br />Ditch D -55 has been reconstructed to meet or exceed these minimum <br />dimensions as shown on the enclosed as -built plan and profile views <br />accompanied by a certification statement by Charles McGlothlin, a registered <br />Professional Engineer in the State of Colorado. These drawings should be <br />added to Exhibit 20. <br />Also enclosed are a completed request for a revision to an existing mining <br />permit, a proposed public notice and Table 20 Ditch Data Page 2.05 -11 a. <br />The NOV has an abated deadline of March 3, 2014. NECC requests a 60 day <br />extension to allow for required public notice provisions and Division review <br />of the enclosed Technical Revision. <br />Three copies of each permit revision/change are enclosed. Please contact me <br />if there is additional information or other documentation is required. <br />Regards, <br />Louis Head <br />Financial Manager <br />
The URL can be used to link to this page
Your browser does not support the video tag.