Laserfiche WebLink
Table 22 <br />Hydrologic Monitoring Requirements <br />Golden Eagle Mine <br />TR -54 - 2003 <br />Site <br />Water <br />Level <br />Field <br />Measurements* <br />Laboratory <br />Analysis <br />Groundwater Sites <br />PAW -5 <br />S <br />S <br />A <br />PAW -6 <br />S <br />S <br />A <br />CCAW -1 <br />S <br />S <br />A <br />SF -2 <br />A <br />NM -20 <br />A <br />NM -21 <br />A <br />NM -22 <br />A <br />GEM -1 Mine Workings) <br />S <br />A <br />A <br />GEM -2 (Mine Workings) <br />S <br />A <br />A <br />GEM -3 (Mine Workings) <br />S <br />KEY: <br />S= Semi - Annually (May & November) <br />A= Annually (November) <br />* =See Table 23 for parameters included in each suite <br />The applicant demonstrated that ground water monitoring was no longer necessary and the <br />Division approved the termination of ground water monitoring as documented in the SL -06 bond <br />release written findings (August 2008) (4.05.13(1). <br />Responsibility for monitoring wells NM -20, NM -21, NM -22, NW -23 and SF -2 was assumed by <br />the New Elk Mine in September 27, 2011 with the Division's final approval of the New Elk <br />Mines PR -02. <br />TR -57 2.05 -47c Revised 08/15/12 <br />