Laserfiche WebLink
0" TABLE OF CONTENTS - CONTINUED <br />RULE 2.05 <br />2.05.1 Objectives 2.05 -1 <br />2.05.2 Operation Plan - Life of Operation 2.05 -1 <br />Production Methods and Equipment 2.05 -1 <br />Operation Description 2.05 -4 <br />2.05.3 Operation Plan - Permit Area 2.05 -5 <br />Production Methods and Equipment 2.05 -5 <br />Operation Description <br />2.05 -6 <br />PAGE <br />2.04.6 <br />Geology Description <br />2.04 -6 <br />2.04.7 <br />Hydrology Description <br />2.04 -7 <br />2.05 -17 <br />Groundwater Information <br />2.04 -7 <br />Coal Handling Structures <br />Surface Water Information <br />2.04 -16 <br />Alternative Water Supply Information <br />2.04 -25 <br />2.04.8 <br />Climatological Information <br />2.04 -26 <br />2.04.9 <br />Soils Resource Information <br />2.04 -29 <br />2.04.10 <br />Vegetation Information <br />2.04 -30(a) <br />2.04.11 <br />Fish and Wildlife Resources Information <br />2.04 -31 <br />2.04.12 <br />Prime Farmland Investigation <br />2.04 -34 <br />RULE 2.05 <br />2.05.1 Objectives 2.05 -1 <br />2.05.2 Operation Plan - Life of Operation 2.05 -1 <br />Production Methods and Equipment 2.05 -1 <br />Operation Description 2.05 -4 <br />2.05.3 Operation Plan - Permit Area 2.05 -5 <br />Production Methods and Equipment 2.05 -5 <br />Operation Description <br />2.05 -6 <br />Mine Facilities <br />2.05 -7 <br />Ponds, Impoundments and Diversions <br />2.05 -9 <br />Culvert Cleaning <br />2.05 -16 <br />Topsoil <br />2.05 -17 <br />Overburden <br />2.05 -17 <br />Coal Handling Structures <br />2.05 -18 <br />Coal Processing Waste & Non -Coal Processing <br />Waste <br />2.05 -18 <br />Underground Development Waste <br />2.05 -19 <br />. <br />Return of Coal Processing Waste to Abandoned <br />Workings <br />2.05 -19 <br />2.05.4 Reclamation Plan <br />2.05 -20 <br />Timetable <br />2.05 -20 <br />Reclamation Cost Estimate <br />2.05 -21 <br />Backfill and Grading <br />2.05 -22 <br />Topsoil Removal, Storage and Redistribution <br />2.05 -22 <br />Revegetation <br />2.05 -24 <br />Sealing and Managing Mine Openings <br />2.05 -27 <br />2.05.5 Post - Mining Land Uses <br />2.05 -29 <br />2.05.6 Mitigation of Surface Coal Mining Operation <br />Impacts <br />2.05 -31 <br />Air Pollution Control Plan <br />2.05 -31 <br />Fish and Wildlife Plan <br />2.05 -31 <br />Protection of Hydrologic Balance <br />2.05 -34 <br />^ Buffer Zone 2.05 -37 <br />Water Rights 2.05 -38 <br />REV(SEO /I /? /? r <br />