My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-03-10_REPORT - M1977342
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1977342
>
2014-03-10_REPORT - M1977342
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/7/2018 3:49:20 PM
Creation date
3/10/2014 10:47:37 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977342
IBM Index Class Name
REPORT
Doc Date
3/10/2014
From
Climax Molybdenum Company
To
DRMS
Email Name
PSH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Annual Report — 2013 <br />Henderson Mine and Mill Reclamation Activities <br />Permit No. M- 1977 -342 <br />1.0 Henderson Mine <br />1.1 Disturbance <br />New disturbance at the Mine in 2013 was limited to incremental caving of the glory hole and exploratory <br />drilling. No changes were made to any of the mine openings (shafts). A site map of the Henderson Mine <br />indicating affected land boundary and disturbance areas is included in Attachment A. <br />1.2 Interim Reclamation <br />Interim reclamation was not carried out at the Henderson Mine in 2013. <br />Routine maintenance of erosion and sediment control structures was completed during the year. <br />1.3 Prospecting <br />1.3.1 Prospecting Contact <br />The contact person for the Notice of Intent (NOI) and prospecting activities is: <br />Bryce Romig <br />Environmental Manager <br />Climax Molybdenum Company <br />Henderson Operations <br />P.O. Box 68 <br />1746 County Rd. 202 <br />Empire, CO 80438 <br />(720) 942 -3231 <br />1.3.2 Prospecting Activities <br />A surface drill program was initiated in July 2011 under Notice of Intent (NOI) P- 2011 -014 on the URAD <br />Valley side of Red Mountain and Harrison Mountain. The original NOI included the construction of five <br />(5) drill pads and corresponding access roads in the vicinity of Red Mountain in 2011 and 2012. A <br />modification request was submitted and approved in 2012 for the construction of three (3) additional drill <br />pads (Sites 6 -8) and corresponding road construction on the adjacent Harrison Mountain, and an <br />extension for drilling activities at all drill pads (Sites 1 -8) through October 31, 2013. The drill pads are <br />indicated on the location figure included in Attachment A. <br />The 2013 activities included the drilling of three holes located at Site 43, Site #4, and Site #8. The collar <br />locations in Latitude and Longitude are as follows: <br />Site # <br />Drill Hole ID <br />Longitude <br />Latitude <br />Elevation <br />Location <br />3 <br />BENX1301 <br />105 49.779W <br />39 45.894N <br />11200 <br />Red Mtn <br />4 <br />HENX1303 <br />105 49.551 W <br />39 46.030N <br />10925 <br />Red Mtn <br />8 <br />HENX1302 <br />105 51.053W <br />39 45.345N <br />12250 <br />Harrison Mtn <br />Page 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.