My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-03-07_REVISION - M1988112 (2)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1988112
>
2014-03-07_REVISION - M1988112 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:40:49 PM
Creation date
3/10/2014 10:19:29 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1988112
IBM Index Class Name
REVISION
Doc Date
3/7/2014
Doc Name
Tailing dam report TR33
From
DRMS
To
McClure & Lobato
Type & Sequence
TR33
Email Name
WHE
GRM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
70
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Step S: Assign PFM to Risk Matrix <br />Figure 18 shows a typical semi - qualitative risk matrix that is used as a graphical tool to <br />characterize risk based on the computed annualized probability of failure and descriptive <br />consequence level. This type of risk matrix was used to delineate approximate tolerable risk <br />guidelines for the various failure modes identified. Potential failure modes that plot in the <br />red - shaded cells would generally be above established risk guidelines, whereas those plotting in <br />the green- shaded cells would generally be below established risk guidelines. Those plotting in <br />the yellow- shaded cells are also generally above risk guidelines, but are not as urgent as those in <br />the red - shaded cells. Risk increases going diagonally from the yellow cells toward the upper <br />right hand corner of the matrix, and hence the urgency of addressing potential failure modes <br />plotting in those cells increases. Similarly, risks decrease moving diagonally from the yellow <br />cells toward the lower left hand corner of the matrix, and the need and urgency to address them <br />also decreases. However, risks plotting in the green- shaded cells should be kept under review <br />and properly managed. This may require continued monitoring and evaluation. <br />Figure 18 Semi - Quantitative Risk Matrix <br />San Luis Project Miller Geotechnical Consultants <br />Tailing Dam Data Report 40 February 2014 <br />
The URL can be used to link to this page
Your browser does not support the video tag.