My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-03-07_PERMIT FILE - M2013070
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2013070
>
2014-03-07_PERMIT FILE - M2013070
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:40:48 PM
Creation date
3/7/2014 3:24:09 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2013070
IBM Index Class Name
PERMIT FILE
Doc Date
3/7/2014
Doc Name
Response to Preliminary Adequacy Review
From
Souder, Miller & Associated for Liberty Mining LLC
To
DRMS
Email Name
GRM
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
262
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COLORADO DEPARTMENT OF PUBLIC HEALTHAND ENVIRONMENT <br />Water Quality Control Division <br />WQCD -P -B2 <br />4300 Cherry Creek Drive South <br />Denver, Colorado 80246 -1530 <br />RA TIONALE <br />STORMWATER DISCHARGES A SSOCL4 TED WITH <br />CONSTRUCTION ACTIVITY <br />GENERAL PERMIT IN COLORADO <br />THIRD RENEWAL <br />COLORADO DISCHARGE PERMIT NUMBER COR- 030000 <br />L INTRODUCTION <br />This permit is for the regulation of stormwater runoff from construction activities, and specific allowable non - <br />stormwater discharges in accordance with Part I. D.3 of the permit. The term "construction activity" includes <br />ground surface disturbing activities, including, but not limited to, clearing, grading, excavation, demolition, <br />installation of new or improved haul and access roads, staging areas, stockpiling of fill materials, and borrow <br />areas. " Stormwater" is precipitation - induced surface runoff. This rationale will explain the background of the <br />Stormwater program, activities which are covered under this permit, how to apply for coverage under this permit, <br />and the requirements of this permit. <br />The forms discussed in the rationale and permit are availahle on the Water Quality Control Division's wehsite <br />at. www cdnhe state co.us/wa/PermitsUnit <br />II. CHANGES IN THIS GENERAL PERMIT <br />Several notable changes from the previous General Permit for Construction Activities have been incorporated into <br />this permit. Significant changes are listed below. Numerous other minor changes were made for clarification <br />purposes only. <br />A. Authority to Discharge <br />This section has been restructured to list all of the types of activities covered by this permit, and to be <br />consistent with the definition of "construction activity. " The definition of construction activity has been <br />expanded to provide clarification. See Part LA.1 of the permit. <br />CONTENTS <br />PAGE <br />I. <br />Introduction <br />1 <br />II. <br />Changes in this General Permit <br />1 <br />III. <br />Background <br />8 <br />IV. <br />Stormwater Discharges Associated with <br />Construction Activity <br />9 <br />V. <br />Coverage Under this Permit <br />10 <br />VI. <br />Application and Certification <br />10 <br />VII. <br />Qualifying Local Programs <br />11 <br />VIII. <br />Terms and Conditions of Permit <br />11 <br />IX. <br />Public Notice — 12122106 <br />15 <br />X. <br />Public Notice — 3123107 <br />15 <br />L INTRODUCTION <br />This permit is for the regulation of stormwater runoff from construction activities, and specific allowable non - <br />stormwater discharges in accordance with Part I. D.3 of the permit. The term "construction activity" includes <br />ground surface disturbing activities, including, but not limited to, clearing, grading, excavation, demolition, <br />installation of new or improved haul and access roads, staging areas, stockpiling of fill materials, and borrow <br />areas. " Stormwater" is precipitation - induced surface runoff. This rationale will explain the background of the <br />Stormwater program, activities which are covered under this permit, how to apply for coverage under this permit, <br />and the requirements of this permit. <br />The forms discussed in the rationale and permit are availahle on the Water Quality Control Division's wehsite <br />at. www cdnhe state co.us/wa/PermitsUnit <br />II. CHANGES IN THIS GENERAL PERMIT <br />Several notable changes from the previous General Permit for Construction Activities have been incorporated into <br />this permit. Significant changes are listed below. Numerous other minor changes were made for clarification <br />purposes only. <br />A. Authority to Discharge <br />This section has been restructured to list all of the types of activities covered by this permit, and to be <br />consistent with the definition of "construction activity. " The definition of construction activity has been <br />expanded to provide clarification. See Part LA.1 of the permit. <br />
The URL can be used to link to this page
Your browser does not support the video tag.