Laserfiche WebLink
Stormwater Construction Site Inspection Report <br />General Information <br />Project Name <br />BMP <br />Installed? <br />Date of Inspection <br />Corrective Action Needed and Notes <br />Location <br />Inspector's Name(s) <br />❑Yes ❑No <br />Start/End Time <br />2 <br />Inspector's Title(s) <br />❑Yes ❑No <br />Inspector's Contact Information <br />Inspector's Qualifications <br />Describe present phase of <br />construction <br />❑Yes ❑No <br />Type of Inspection: <br />❑ Regular ❑ Pre -storm <br />event ❑ During storm event <br />❑ Post -storm event <br />4 <br />Weather Information <br />Has there been a storm event since the last inspection? ❑Yes ❑No <br />If yes, provide: <br />Storm Start Date & Time: Storm Duration (hrs): Approximate Amount of Precipitation (in): <br />Weather at time of this inspection? <br />❑ Clear ❑Cloudy ❑ Rain ❑ Sleet 0 Fog ❑ Snowing ❑ High Winds <br />❑ Other: Temperature: <br />Have any discharges occurred since the last inspection? ❑Yes ❑No <br />If yes, describe: <br />Are there any discharges at the time of inspection? OYes ❑No <br />If yes, describe: <br />Site - specific BMPs <br />• Number the structural and non - structural BMPs identified in your SWPPP on your site map and list them <br />below (add as many BMPs as necessary). Carry a copy of the numbered site map with you during your <br />inspections. This list will ensure that you are inspecting all required BMPs at your site. <br />• Describe corrective actions initiated, date completed, and note the person that completed the work in the <br />Corrective Action LoQ. <br />Liberty Mine <br />BMP <br />BMP <br />Installed? <br />BMP <br />Maintenance <br />Required? <br />Corrective Action Needed and Notes <br />1 <br />❑Yes ONo <br />❑Yes ❑No <br />2 <br />❑Yes ❑No <br />❑Yes ❑No <br />3 <br />1 ❑Yes ONo <br />❑Yes ❑No <br />4 <br />1 ❑Yes ❑No <br />❑Yes 0No <br />Liberty Mine <br />