My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-03-07_PERMIT FILE - M2013070
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2013070
>
2014-03-07_PERMIT FILE - M2013070
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:40:48 PM
Creation date
3/7/2014 3:24:09 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2013070
IBM Index Class Name
PERMIT FILE
Doc Date
3/7/2014
Doc Name
Response to Preliminary Adequacy Review
From
Souder, Miller & Associated for Liberty Mining LLC
To
DRMS
Email Name
GRM
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
262
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
-1 SMA <br />A'-!Sv- <br />March 6, 2014 <br />Souder, Miller & Associates • 401 W. Broadway + Farmington, NM 87401 <br />(505) 325.7535 • (800) 519 -0098 •fax (505) 32(}0045 <br />Mr. Travis Marshall <br />Department of Natural Resources <br />Division of Reclamation, Mining and Safety <br />1313 Sherman St., Room 215 <br />Denver, CO 80203 <br />#5121897 <br />RE: LIBERTY MINE, FILE No. M- 2013 -070, DESIGNATED MINING LIMITED IMPACT 11 OD <br />OPERATION RECLAMATION PERMIT APPLICATION, RESPONSE TO PRELIMINARY ADEQUACY <br />REVIEW <br />Dear Mr. Marshall: <br />On behalf of Liberty Mining, LLC, Souder, Miller and Associates (SMA) submits this response to <br />the preliminary adequacy review comments dated January 28, 2014, prepared by the <br />Department of Natural Resources Division of Reclamation Mining and Safety (DRMS). The <br />response follows the order of the January 28, 2014 comments. <br />Exhibit C <br />1. Liberty Mining commits to submission of a technical revision to address the methods <br />to be implemented to address a ground water issue should quantifiable /excessive <br />ground water be encountered. <br />2. Water rights are actively being sought by Liberty Mining to allow the use and /or <br />evaporation of captured stormwater falling on the surface of the operations. <br />3. The stormwater management plan and preliminary Drainage Report prepared by a <br />Professional Engineer as requested by DRMS is included with this response as <br />Appendix A. The final, Professional Engineer - certified drainage design plan <br />including construction drawings will be prepared contingent on permit approval and <br />will be submitted for DRMS approval prior to any construction work. <br />4. Rule 6.3.3(1)(m) is addressed in the application in Exhibit C, Mining Plan. Ore and <br />minerals removed from the mine and brought to the surface will be placed and <br />contained on a concrete ore storage pad. The mined materials will be held on the <br />ore storage pad until an adequate amount has accumulated for transportation off site <br />to a processing facility. No processing of the ore or minerals will occur on the mine <br />site. The ore storage pad structure will consist of a box -like structure dug into the <br />surface grade, with reinforced concrete walls, a downward sloped concrete floor, and <br />a concrete drive -over berm across the entrance to prevent water from flowing down <br />into the storage pad structure, to allow placement of ore as brought to the surface, <br />and to facilitate the loading for transport off site for processing. <br />
The URL can be used to link to this page
Your browser does not support the video tag.