Laserfiche WebLink
Cost Estimate for Reclamation <br />The converted MMM Partnership Pit will have a total of 27.8 acres. The effective mined area is 26.1 acres. . <br />While not yet released, approximately 4.2 acres within the original permit have been mined and revegetated. <br />This reduces the net effective area to be reclaimed to be 21.9 acres <br />1) The area of excavation will be mined as close to a slope of 3:1 as possible and finished at 3:1. <br />2) All topsoil will be re- applied to the excavations lying outside the creekbed. No overburden is anticipate. <br />3) The slopes will be prepared and seeded as recommended by the Natural Resource Conservation Service. <br />4) E)asbng topsoil is 24' in depth. That is what will be replaced. <br />MUM Parbwmhia Grave Pit (converted to 112 permit <br />Task Volumes Units Unit Cost Item Cost <br />Backfill and Grade 97.4 Hours $115.00 $11,201.00 <br />to 3:1 slopes <br />Replace Topsoil/Overburden <br />Tractor /Speedy Mover 151 Hours $75.00 $11,325.00 <br />Revegetate Site <br />Cover crop 21.9 Acres $50.00 $1,095.00 <br />Grass seeding 21.9 Acres $50.00 $1,095.00 <br />Seed 194.91 Lbs. $9.70 $1,890.63 <br />(21.9 acres x 8.9 # PLS /Acre) <br />Mobilization <br />Tractor /Speedy Mover 2 Hours $75.00 $150.00 <br />Dozer 2 Hours $125.00 $250.00 <br />TOTAL $27,006.63 <br />Total Estimated Cost / Total Affected Area = Estimated Cost per Acre <br />$27,006.63 21.9 $1,233.18 <br />