My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-03-06_REVISION - C1996083 (3)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1996083
>
2014-03-06_REVISION - C1996083 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:40:47 PM
Creation date
3/7/2014 8:07:48 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083
IBM Index Class Name
Revision
Doc Date
3/6/2014
Doc Name
2nd Adequacy Review
From
DRMS
To
Bowie Resources, LLC
Type & Sequence
TR84
Email Name
SLB
SB1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Bowie No. 2 Mine C1996083 Technical Revision No. 84- Second Adequacy Review <br />BULLDOZER WORK <br />Task description: Backfill and Regrade Pond J Expansion <br />Permit Action: Technical Revision <br />Site: Bowie No. 2 Mine 84 Permit /Job #: C1996083 <br />PROJECT IDENTIFICATION <br />Task #: 99A State: Colorado <br />Date: 3/6/2014 County: Delta <br />User: SLB <br />Agency or organization name: DRMS <br />HOURLY EOU <br />Basic Machine: <br />Horsepower: <br />Blade Type: <br />Attachment: <br />Shift Basis: <br />Data Source: <br />Cost Breakdown. <br />1PMENT COST <br />Cat D10T - 10SU <br />574 <br />Semi - Universal <br />3 -shank ripper <br />1 per day <br />(CRG) <br />Ownership <br />$110.73 <br />Cost/Hour: <br />Operating Cost/Hour: <br />$18336 <br />Ripper op. <br />$0.00 <br />Cost/Hour: <br />Operator Cost/Hour: <br />$37.41 <br />Total unit Cost/Hour: <br />$331.50 <br />Total Fleet <br />$331.50 <br />Cost/Hour: <br />MATERIAL OUANTITIES <br />Utilization % <br />NA <br />100 <br />0 <br />Initial Volume: 2,000 <br />Swell factor: 1330 <br />Loose volume: 2,660 LCY <br />Source of estimated volume: Map 22.1; Operator Estimate <br />Source of estimated swell Cat Handbook <br />factor <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly <br />production: <br />Materials consistency <br />description: <br />100 feet <br />1,718.9 LCY/hr <br />NA <br />Compacted fill or embankment 0.9 <br />Abbreviation: None <br />Filename: C083 -99a <br />CIRCES Cost Estimating Software <br />Page 14 of 15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.