My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-03-06_REVISION - C1996083 (3)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1996083
>
2014-03-06_REVISION - C1996083 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:40:47 PM
Creation date
3/7/2014 8:07:48 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083
IBM Index Class Name
Revision
Doc Date
3/6/2014
Doc Name
2nd Adequacy Review
From
DRMS
To
Bowie Resources, LLC
Type & Sequence
TR84
Email Name
SLB
SB1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Bowie No. 2 Mine C1996083 Technical Revision No. 84- Second Adequacy Review Page 12 of 15 <br />COST SUMMARY WORK <br />Task <br />description: Cost Summary TR -84 <br />Permit Action: Technical <br />Site: Bowie No. 2 Mine Revision 84 Permit /Job#: C1996083 <br />PROJECT IDENTIFICATION <br />Task #: OOF <br />Date: 3/6/2014 <br />User: SLB <br />State: Colorado <br />County: Delta <br />Agency or organization name: DRMS <br />TASK LIST (DIRECT COSTS) <br />Abbreviation: None <br />Filename: C083 -OOF <br />INDIRECT COSTS <br />OVERHEAD AND PROFIT: <br />lee <br />Liability insurance: <br />Task <br />Performance bond: <br />Form <br />t <br />Task <br />Profit: <br />10.00% <br />Description <br />Used <br />Hours <br />Cost <br />Size <br />354 <br />Gob Pile #3 Structure Removal Update <br />DEMOLISH <br />1 <br />0.00 <br />($10,21437) <br />99a <br />1 1 <br />$1,443.43 <br />Backfill and Regrade Pond J Expansion <br />DOZER <br />435 <br />SUBTOTALS: <br />4.35 <br />($8,770.94) <br />INDIRECT COSTS <br />OVERHEAD AND PROFIT: <br />Liability insurance: <br />2.02% <br />Performance bond: <br />1.05% <br />Job superintendent: <br />0.00 hrs <br />Profit: <br />10.00% <br />Total <br />Total <br />Total <br />Total <br />TOTAL O & P <br />CONTRACT AMOUNT (direct + O & P) <br />LEGAL - ENGINEERING - PROJECT MANAGEMENT: <br />Financial warranty processing (legal /related costs) <br />Engineering work and /or contract/bid preparation <br />Reclamation management and /or administration <br />0.00 <br />4.00% <br />3.13% <br />CONTINGENCY: 0.00 <br />($177.17) <br />($92.09) <br />$0.00 <br />($877.09) <br />$1,146.35 <br />($9,917.29) <br />Total = 0.00 <br />Total = ($396.69) <br />($310.41) <br />Total = $0.00 <br />TOTAL INDIRECT COST = ($1,853.45) <br />TOTAL BOND AMOUNT (direct + indirect) _ ($10,624.39) <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.