Laserfiche WebLink
L PROCEDURES AND SUMMARY OF THE REVIEW PROCESS <br />Seneca Coal Company, LLC applied for a partial bond release under the Colorado Surface Coal <br />Mining and Reclamation Act following reclamation of the Yoast Mine. The mine area is located <br />in: <br />Township 6 North, Range 87 West <br />Section 28: Portions of NW /4, SE /4 NW /4, SW /4 NE /4, NW /4 SW /4 <br />Section 29: Portions of E/2 SE /4, SW /4 SE /4 <br />Section 32: Portions of W/2 E/2 <br />Township 5 North, Range 87 West <br />Section 5: Portions of W/2 E/2 <br />Section 8: NW /4, SW /4, W/2 NE /4, W/2 SE /4 <br />Section 16: SW /4 NW /4, NW /4 SW /4, and portions of SW /4 SW /4, <br />NW /4 NW /4, SE /4 NW /4, NE /4 SW /4, NW /4 SE /4 <br />Section 17: All <br />Section 18: NE /4 SE /4, S/2 SE /4 <br />Section 19: E/2 and portions of E/2 W/2 <br />Section 20: SW /4 NW /4, W/2 SW /4, N/2 NW /4, and portions of N/2 <br />NE /4 <br />Section 29: NW /4 NW /4 <br />Section 30: N2 NE /4 <br />The Division has previously approved four bond release applications at the Yoast Mine. SL -1, <br />approved on March 6, 2007, released $11,862.00 of Phase I liability on 173.02 acres in the North <br />Pit. SL -2, approved June 15, 2010, released $790,205.00 of Phase I liability on 456.7 acres in <br />the South Pit and Neck Pit areas. SL -3, approved on January 18, 2012, released $1,693,918.00 <br />of Phase II liability on 592 acres in the North and South Pit areas. SL -4, approved November 9, 2012, <br />released $452,336.00 Phase I liability of 115.5 acres, consisting of the Yoast Access road, light use <br />road LU -1, Pond 010, light use road LU -2, topsoil stockpile I, the dragline assembly /disassembly <br />pad, the YPM -8 drainage channel, YPM -8 watershed, light use roads LU -3A and LU -313, and Stock <br />tank ST -1. No Phase III bond release has previously been granted on any of the disturbance area. <br />Table 1 of this document provides a detailed summary of previous bond release acreages and <br />exclusions. The Division did not approve Phase I bond release of the dragline deadhead route with <br />approval of SL -4 due to round -about construction by Routt County at the time of SL -4 review. <br />An application for partial Phase I, 11 and III (final) bond release was received by the Division on August <br />26, 2013. The application was deemed complete on December 3, 2013, after the Division received proof <br />of publication of the applicant's public notice. Seneca Coal Company, LLC published notice of the bond <br />release application in Steamboat Pilot once weekly for four consecutive weeks, beginning September 29, <br />2013. Seneca Coal Company, LLC also notified land owners within and adjacent to the mine permit <br />area, and other interested parties of the application for bond release, as required by Rule 3.03.2(1). <br />No comments, written objections, or requests for an informal conference regarding the bond release <br />application were received by the Division. <br />C1994 -082 Yoast Mine SL5 3 March 5, 2014 <br />