Laserfiche WebLink
Haul Time: 7.266 minutes <br />Return Route: <br />Seg # <br />Net Cycle Time Adjustment: NA <br />minutes <br />Grade ( %) <br />Adjusted Loader Cycle Time: 0.445 <br />minutes <br />Velocity <br />Net Load Time per Truck: 1.880 <br />minutes <br />Truck Cycle Time: <br />( %) <br />(Ft) <br />Truck Exchange Time: 0.50 <br />Minutes Adjusted for site altitude: <br />0.500 Minutes <br />Truck Load Time: 1.880 <br />Minutes Adjusted for site altitude: <br />1.880 Minutes <br />Truck Maneuver and Dump Time: 0.80 <br />Minutes Adjusted for site altitude: <br />0.800 Minutes <br />Truck Travel (Haul & Return) Time: <br />Road Condition: Firm, smooth, rolling, dirt/lt. surfaced, watered, <br />maintained 3.0 <br />3.00 <br />-2.00 <br />Haul Route: <br />3.509 <br />1 <br />Haul Time: 7.266 minutes <br />Return Route: <br />Seg # <br />Seg # <br />Haul Distance <br />Grade ( %) <br />Roll. Res <br />Total Res <br />Velocity <br />Travel <br />(Ft) <br />( %) <br />(Ft) <br />(fpm) <br />( %) <br />( %) <br />(fpm) <br />min <br />Adjusted single truck/loader team production: 137.11 <br />Adjusted multiple truck/loader team production: 137.11 <br />(min) <br />1 <br />10000.00 <br />-5.00 <br />3.00 <br />-2.00 <br />2938 <br />3.509 <br />1 <br />10000.00 <br />5.00 <br />3.00 <br />8.00 <br />1381 <br />7.266 <br />Haul Time: 7.266 minutes <br />Return Route: <br />Seg # <br />Haul Distance <br />Grade ( %) <br />Roll. Res <br />Total Res <br />Velocity <br />Travel <br />242.14 LCY/Hour Adjusted for job efficiency: <br />(Ft) <br />( %) <br />( %) <br />(fpm) <br />6 Truck(s) Selected Number of Trucks: <br />Adjusted hourly truck team production: 137.11 <br />Adjusted single truck/loader team production: 137.11 <br />Adjusted multiple truck/loader team production: 137.11 <br />(min) <br />1 <br />10000.00 <br />-5.00 <br />3.00 <br />-2.00 <br />2938 <br />3.509 <br />JOB TIME AND COST <br />Fleet size: 1 Team(s) Total job time: <br />Unit cost: $2.864 /LCY Total job cost: <br />minutes <br />minutes <br />200.98 LCY/Hour <br />34.28 LCY/Hour <br />4 Truck(s) <br />LCY/Hour <br />LCY/Hour <br />LCY/Hour <br />291.74 Hours <br />$114,544.84 <br />Return Time: 3.509 <br />Total Truck Cycle Time: 13.955 <br />Loading Tool unit <br />Production <br />242.14 LCY/Hour Adjusted for job efficiency: <br />Truck Unit Production <br />41.30 LCY/Hour Adjusted for job efficiency: <br />Optimal No. of Trucks: <br />6 Truck(s) Selected Number of Trucks: <br />Adjusted hourly truck team production: 137.11 <br />Adjusted single truck/loader team production: 137.11 <br />Adjusted multiple truck/loader team production: 137.11 <br />JOB TIME AND COST <br />Fleet size: 1 Team(s) Total job time: <br />Unit cost: $2.864 /LCY Total job cost: <br />minutes <br />minutes <br />200.98 LCY/Hour <br />34.28 LCY/Hour <br />4 Truck(s) <br />LCY/Hour <br />LCY/Hour <br />LCY/Hour <br />291.74 Hours <br />$114,544.84 <br />