My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-03-05_REVISION - C1994082 (6)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1994082
>
2014-03-05_REVISION - C1994082 (6)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:40:44 PM
Creation date
3/6/2014 8:35:46 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1994082
IBM Index Class Name
Revision
Doc Date
3/5/2014
Doc Name
Cost Estimate
From
DRMS
To
Seneca Coal Company, LLC
Type & Sequence
SL5
Email Name
JHB
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
100
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Task description <br />Site: Yoast Mine <br />BULLDOZER WORK <br />Grade Valora Pit E/W (Scraper Pit) Highwall <br />PROJECT IDENTIFICATION <br />Task #: 02B <br />Date: 2/26/2014 <br />9:51:14 AM <br />Permit Action: SL5 Liabilitv <br />State: Colorado <br />County: <br />Routt <br />Permit/Job #: C1994082 <br />Abbreviation: None <br />Filename: C082 -02b <br />User: JHB <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Basic Machine: Cat D1 1R - 11U <br />Horsepower: 850 <br />Blade Type: Universal <br />Attachment: NA <br />Shift Basis: 1 per day <br />Data Source: (CRG) <br />Cost Breakdown: <br />Utilization % <br />Ownership Cost/Hour: $126.54 <br />NA <br />Operating Cost/Hour: $280.92 <br />100 <br />Ripper op. Cost/Hour: $0.00 <br />0 <br />Operator Cost/Hour: $37.41 <br />NA <br />Total unit Cost/Hour: $444.88 <br />Total Fleet Cost/Hour: $889.76 <br />MATERIAL OUANTITIES <br />Initial Volume: 42,900 <br />Swell factor: 1.000 <br />Loose volume: 42,900 LCY <br />Source of estimated volume <br />Source of estimated swell <br />factor: <br />HOURLY PRODUCTION <br />Division of Reclamation, Mining & Safety <br />Cat Handbook <br />Average push distance: 100 feet <br />Unadjusted hourly <br />production: 2,870.3 LCY/hr <br />Materials consistency description: Partly consolidated stockpile 1.1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.