Laserfiche WebLink
Task description <br />Site: Yoast Mine <br />SCRAPER TEAM WORK <br />Replace Topsoil from Stockpile A to Pond 010 <br />Permit Action: SL5 Liabilitv <br />PROJECT IDENTIFICATION <br />Task #: 040 State: Colorado <br />Date: 2/26/2014 County: <br />1:46:12 PM Routt <br />User: JHB <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT <br />Permit/Job #: C1994082 <br />Abbreviation: None <br />Filename: C082 -040 <br />COSTShift basis: 1 per day <br />Equipment Description <br />- Scraper: Cat 637G w /push -pull <br />- Dozer: NA <br />Support Equipment -Load Area: NA <br />-Dump Area: NA <br />Road Maintenance —Motor Grader: CAT 14M <br />-Water Truck: Water Tanker, 10,000 Gal. <br />Cost Breakdown: Scraper Work Team Support Equipment Maintenance Equipment <br />Total work team cost/hour: $1,649.37 <br />MATERIAL QUANTITIES <br />Initial volume: 45,616 CCY Swell factor: 1.115 <br />Loose volume: 50,862 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Material weight: 2,100 lbs /LCY <br />Scraper Bowl (volume) Basis: <br />Struck Volume: 24.00 LCY <br />Scraper <br />Dozer <br />Load Area <br />Dump Area <br />Motor Grader <br />Water Truck <br />%Utilization- machine: <br />100 <br />NA <br />NA <br />NA <br />25 <br />25 <br />Ownership cost/hour: <br />$100.38 <br />NA <br />NA <br />NA <br />$37.98 <br />$52.97 <br />Operating cost/hour: <br />$235.35 <br />NA <br />NA <br />NA <br />$16.94 <br />$29.77 <br />Ripper op. cost/hour: <br />NA <br />NA <br />NA <br />NA <br />$0.00 <br />$0.00 <br />Operator cost/hour: <br />$30.02 <br />NA <br />NA <br />NA <br />$27.55 <br />$21.17 <br />Unit Subtotals: <br />$365.75 <br />NA <br />NA <br />NA <br />$82.46 <br />$103.91 <br />Number of Units: <br />4 <br />0 <br />0 <br />0 <br />1 <br />1 <br />Group Subtotals: <br />Work: <br />$1,463.00 <br />Support: <br />$0.00 <br />Maint: <br />$186.37 <br />Total work team cost/hour: $1,649.37 <br />MATERIAL QUANTITIES <br />Initial volume: 45,616 CCY Swell factor: 1.115 <br />Loose volume: 50,862 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Material weight: 2,100 lbs /LCY <br />Scraper Bowl (volume) Basis: <br />Struck Volume: 24.00 LCY <br />