My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-03-05_REVISION - C1994082 (6)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1994082
>
2014-03-05_REVISION - C1994082 (6)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:40:44 PM
Creation date
3/6/2014 8:35:46 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1994082
IBM Index Class Name
Revision
Doc Date
3/5/2014
Doc Name
Cost Estimate
From
DRMS
To
Seneca Coal Company, LLC
Type & Sequence
SL5
Email Name
JHB
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
100
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Task description <br />Site: Yoast Mine <br />BULLDOZER WORK <br />Regrade Access Road to Drill Pad #2 from Minor Revision 18 <br />Permit Action: SL5 Liabilitv <br />PROJECT IDENTIFICATION <br />Task #: 022 State: Colorado <br />Date: 3/11/2013 County: Routt <br />User: JLE <br />Agency or organization name: DRMS <br />HOURLY EOUI <br />Basic Machine: <br />Horsepower: <br />Blade Type: <br />Attachment: <br />Shift Basis: <br />Data Source: <br />Cost Breakdown: <br />PMENT COST <br />Cat DI IR - I IU <br />850 <br />Universal <br />NA <br />1 per day <br />(CRG) <br />Permit/Job #: C1994082 <br />Abbreviation: None <br />Filename: C082 -022 <br />Total unit Cost/Hour: $444.88 <br />Total Fleet Cost/Hour: 5889.76 <br />1►I /:11Y1»NEllW111L11►YYYY11R <br />Initial Volume: 330 <br />Swell factor: 1.165 <br />Loose volume: 384 LCY <br />Source of estimated volume <br />Source of estimated swell <br />factor: <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly <br />production: <br />Division of Reclamation, Mining & Safety <br />Cat Handbook <br />200 feet <br />1,560.0 LCY/hr <br />Materials consistency description: Compacted fill or embankment 0.9 <br />Average push gradient <br />Average site altitude: <br />5% <br />7,800 feet <br />Utilization % <br />Ownership Cost/Hour: <br />$126.54 <br />NA <br />Operating Cost/Hour: <br />$280.92 <br />100 <br />Ripper op. Cost/Hour: <br />$0.00 <br />0 <br />Operator Cost/Hour: <br />$37.41 <br />NA <br />Total unit Cost/Hour: $444.88 <br />Total Fleet Cost/Hour: 5889.76 <br />1►I /:11Y1»NEllW111L11►YYYY11R <br />Initial Volume: 330 <br />Swell factor: 1.165 <br />Loose volume: 384 LCY <br />Source of estimated volume <br />Source of estimated swell <br />factor: <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly <br />production: <br />Division of Reclamation, Mining & Safety <br />Cat Handbook <br />200 feet <br />1,560.0 LCY/hr <br />Materials consistency description: Compacted fill or embankment 0.9 <br />Average push gradient <br />Average site altitude: <br />5% <br />7,800 feet <br />
The URL can be used to link to this page
Your browser does not support the video tag.