Laserfiche WebLink
Task description <br />Site: Yoast Mine <br />BULLDOZER WORK <br />Regrade Pond 011 <br />PROJECT IDENTIFICATION <br />Task #: 031 <br />Date: 2/26/2014 <br />10:00:33 AM <br />Permit Action: SL5 Liabilitv <br />State: Colorado <br />County: <br />Routt <br />Permit/Job #: C1994082 <br />Abbreviation: None <br />Filename: C082 -031 <br />User: JHB <br />Agency or organization name: <br />DRMS <br />HOURLY EQUIPMENT COST <br />Basic Machine: Cat D9T - 9SU <br />Horsepower: 405 <br />Blade Type: Semi - Universal <br />Attachment: 3 -shank ripper <br />Shift Basis: 1 per day <br />Data Source: (CRG) <br />Cost Breakdown: <br />Utilization % <br />Ownership Cost/Hour: <br />$78.33 <br />NA <br />Operating Cost/Hour: <br />$142.13 <br />100 <br />Ripper op. Cost/Hour: <br />$1.99 <br />25 <br />Operator Cost/Hour: <br />$37.41 <br />NA <br />Total unit Cost/Hour: $259.86 <br />Total Fleet Cost/Hour: $259.86 <br />MATERIAL OUANTITIES <br />Initial Volume: 8,389 <br />Swell factor: 1.165 <br />Loose volume: 9,773 LCY <br />Source of estimated volume <br />Source of estimated swell <br />factor: <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly <br />production: <br />Division of Reclamation, Mining & Safety <br />Cat Handbook <br />150 feet <br />910.5 LCY/hr <br />Materials consistency description: Compacted fill or embankment 0.9 <br />