Laserfiche WebLink
ROADABLE EQUIPMENT: <br />Machine Description <br />Total Cost/hr/ unit <br />Fleet Size <br />Haul Trip <br />Return Trip <br />30.00 mph <br />Total Non - Roadable Mob/Demob Cost <br />NA <br />Cost/hr/ fleet <br />Cost/hr/ fleet <br />Generic 8 -10 cy, 6x4 <br />$81.14 <br />10 <br />$811.40 <br />$811.40 <br />Flatbed Truck, 6x4, 45K GVW <br />$109.03 <br />10 <br />$1,090.30 <br />$1,090.30 <br />Subtotals: $1,901.70 I $1,901.70 <br />EQUIPMENT HAUL DISTANCE and Time <br />Nearest Major City or Town within project area region: <br />HAYDEN <br />Total one -way travel distance: <br />10.00 miles <br />Average Travel Speed: <br />30.00 mph <br />Total Non - Roadable Mob/Demob Cost <br />NA <br />2.50 <br />$52,653.56 <br />`* two round trips with haul rig: <br />0.67 <br />Total Roadable Mob/Demob Cost ** <br />$1,267.80 <br />** one round trip, no haul rig: <br />Transportation Cycle Time: <br />Haul Time (Hours): <br />Return Time (Hours): <br />Loading Time (Hours): <br />Unloading Time (Hours): <br />Subtotals: <br />JOB TIME AND COST <br />Non - Roadable <br />Equipment <br />Roadable <br />Equipment <br />0.33 <br />0.33 <br />0.33 <br />0.33 <br />2.50 <br />NA <br />2.50 <br />NA <br />5.67 <br />0.67 <br />Total job time: 11.33 Hours <br />Total job cost: $53,921.36 <br />