My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-03-05_REPORT - M1977493
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1977493
>
2014-03-05_REPORT - M1977493
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/20/2019 10:14:20 AM
Creation date
3/6/2014 8:20:38 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977493
IBM Index Class Name
REPORT
Doc Date
3/5/2014
Doc Name
Annual Fee/Report/Map
From
Climax Molybdenum Company
To
DRMS
Email Name
ECS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Climax Mine Water Quality Monitoring Plan Evaluation - 2013 <br />Sampling Locations <br />Groundwater Sample Locations: ARwell, ARK -MW -001 D, ARK- MW -002S, ARK -MW- <br />002D, EVMW -1 S, EVMW -1 D, EVMW -2, EVMW -3S, <br />EVMW -3D, EV -MW -004, EVS -1, EVS -2, EVS -3, GWM -1, <br />TM-MW-001D, GWM -2, TM- MW -002D <br />Internal Surface Water Sample <br />Locations: CC -SW1, EI -SW1 <br />Surface Water Sample Locations: Arkansas #1, Arkansas #2, Al, BI, EPR Outlet <br />During 2013 water quality samples were successfully collected from the above sample <br />locations with the exception of the following: <br />First Quarter: <br />- ARwell, GWM -1, and GWM -2 — Frozen <br />- ARK -MW -001 D — Artesian well, plugged until pumping equipment installed in <br />third quarter <br />- EVS -1, EVS -2, EVS -3, Arkansas #1, Arkansas #2, CC -SW1, EI -SW1, Al, and BI <br />— Inaccessible <br />Second Quarter: <br />- EPR Outlet — Insufficient Flow <br />- ARK-MW-001D —Equipment failure during plug removal, well remained plugged <br />until third quarter <br />Fourth Quarter: <br />- EVS -2 — Inaccessible <br />ARK -MW -001 D is a flowing artesian well and, after being sampled in the fourth quarter of <br />2012, was temporarily sealed to avoid freezing during the winter and possible damaging <br />the well. Once the plug was successfully removed from the well a dedicated pump and <br />frost -free hydrant were installed to allow for quarterly sampling. Tabulated data for all <br />monitoring sites follows this discussion. <br />Discussion of Results: NPL and CBSG Criteria for POC Wells <br />The results for the indicator parameters of the POC Wells were tabulated and compared to <br />the NPL (or CBSG Criteria) for each parameter. Utilizing the procedure in Section 5.1 of <br />the WQMP, and displayed in the POC Well Numeric Protection Level Calculation Data <br />tables following this report, Climax is proposing NPLs based on the CBSG Criteria for POC <br />
The URL can be used to link to this page
Your browser does not support the video tag.