Laserfiche WebLink
Reveg Worksheet Cont'd Task # 03A Page 2 of 2 <br />Drill seeding (DRMS Cost Data) <br />$88,20 <br />Total Seed Application Cost/Acre <br />$88.20 <br />MULCHING and MISCELLANEOUS <br />Materials <br />acation <br />-Description I Cost /Acre_ <br />Crimping, with tractor {DMG survey data} 1 _ W—.89 <br />Power mulcher MEANS 32 91 13.16 0250) $86.68 <br />Weed spry, , truck, non-aquatic area, nox. [DMG] <br />$61.49 <br />Total Mulch Application Cost/Acre $214.06 <br />NURSERY STOCK PLANTING <br />Common Name <br />Units / <br />Type and Size <br />Planting <br />Cost <br />Fertilizer <br />Pellet Cost <br />Description <br />Acre <br />Unit <br />Cost / Unit <br />Cost /Acre <br />Straw, delivered-1 MEANS 3125 14.16 12001 <br />1.50 <br />-TON <br />�265.00 <br />S30_.50_ <br />Total Mulch Materials Cost/Acre <br />I <br />I <br />1 <br />$397.50 <br />acation <br />-Description I Cost /Acre_ <br />Crimping, with tractor {DMG survey data} 1 _ W—.89 <br />Power mulcher MEANS 32 91 13.16 0250) $86.68 <br />Weed spry, , truck, non-aquatic area, nox. [DMG] <br />$61.49 <br />Total Mulch Application Cost/Acre $214.06 <br />NURSERY STOCK PLANTING <br />Common Name <br />No <br />Acre <br />Type and Size <br />Planting <br />Cost <br />Fertilizer <br />Pellet Cost <br />Cost /Acre <br />$0.00 <br />Totals Nursery Stock Cost / Acre <br />JOB TIME AND COST <br />No. of Acres: <br />Estimated Failure Rate: <br />*Selected Replanting Work Items: <br />Initial Job Cost: $42,328.00 <br />Reseeding Job Cost: $10,582.00 <br />Total Job Cost: $52,910.00 <br />Job Hours: 16.00 <br />50 Cost /Acre: $846.56 <br />250o Cost /Acre*: $846.56 <br />TILLING,SEEDING,MULCHING <br />CIRCES Cost Estimating Software <br />